
Tiler pricing in Limerick
What tilers charge in Limerick (typically €35-€80/hr), the local factors that move the rate, and a sample quote you can use as a starting point.
No credit card required
Limerick tiler pricing
What tilers should charge in Limerick
Limerick tilers serve Castletroy (V94) and Corbally (V94) premium bathroom and kitchen renos, South Circular Road and Ennis Road (V94) heritage Victorian and Georgian, Newtown Pery (V94) Georgian Protected Structure sympathetic floor tiling, UL student rental cycle in Castletroy, and pharma plus medtech commercial fit-out in Raheen and Annacotty. CIRI registration mandatory. Imported large-format porcelain common at premium tier.
Hourly rate
€35-€80
per hour, weekday daytime
Call-out fee
€25-€53
within standard radius
After-hours
1.5-2x
evening, weekend, holiday
Job pricing
What to charge for common tiler jobs in Limerick
Real-world price ranges for the jobs local tradies quote every week. Use the table as a starting point for your own quotes and adjust for parts, access, and your overheads. All figures in EUR.
Site visit and measure
What's included
Most tilers visit free for jobs over €1,050. Detailed CAD plans for patterned floors may be charged.
Kitchen splashback (per sqm)
What's included
Includes tile cuts around outlets, edge trim, grout, and 1-2 days labour. Mosaic or natural stone adds cost.
Bathroom wall tile (per sqm)
What's included
Includes waterproofing membrane on wet areas, tile, grout, and labour. Patterns and small format tiles cost more.
Bathroom floor tile (per sqm)
What's included
Includes waterproofing, screed if needed, tile, grout, and labour. Large format porcelain or anti-slip rated tiles cost more.
Full bathroom retile (walls + floor)
What's included
Includes strip-out, waterproofing, screed, tiles, grout, silicon, 5-7 days labour. Bath/shower replacement priced separately.
Kitchen floor tile (per sqm)
What's included
Includes prep, tile, grout, and labour. Skirting cut-back, threshold strips, and edge trim quoted separately.
Outdoor patio tile (per sqm)
What's included
Includes anti-slip rated porcelain or natural stone, drainage falls, exterior-grade adhesive, and labour. Pool surrounds cost more.
Floor screed prep (per sqm)
What's included
Self-levelling compound to fix uneven floors before tile laying. Required where deflection >5mm. Add if floor is concrete-rough.
Tile removal (per sqm)
What's included
Includes strip, debris removal, and substrate clean. Cement-bed tile removal runs higher than thinset.
Limerick quote factors
What to factor into your Limerick tiler quote
Local context that should shape what you quote as a tiler in Limerick. Mild oceanic Atlantic. Mild winters (Dec-Feb, 4-9°C, occasional frost), cool summers (June-Aug, 15-20°C), high rainfall (~1,000mm/year), strong wind. Shannon River flooding risk (2014 Limerick CBD flooded).
CIRI registration + premium credentials
CIRI (Construction Industry Register Ireland) registration is mandatory for tax-compliant trading. Tile Association of Ireland (TAI) membership is the regional trust signal at premium tier. Print on every quote. Premium Castletroy, South Circular Road and Corbally customers expect documented credentials.
Castletroy + Corbally large-format porcelain premium
Castletroy (V94), South Circular Road (V94), Ennis Road (V94), Corbally (V94) and Annacotty (V94) clients want 600x1200mm and larger porcelain (Tilestyle, Tile Style, Ca' Pietra, Floors of Stone, Porcelanosa). Quote per-sqm at €70-€125 install rate plus tile (€45-€300+/sqm material). Standard Limerick €40-€80/sqm install plus tile.
Bathroom waterproofing + IS EN 14411 compliance
IS EN 14411 (ceramic tile standard) and Building Regs Part L require tanking on wet-area substrates. Quote tanking (€28-€60/sqm with anti-mould additives) as separate line on every bathroom and wet-room. Schluter Kerdi, Mapei Mapelastic AquaDefense, BAL Tank-it common spec.
Newtown Pery Georgian sympathetic floor tiling
Newtown Pery (V94) Protected Structures often retain original encaustic, Victorian patterned or Georgian flagstone floors. Quote sympathetic restoration (€80-€180/sqm), like-for-like reproduction (Original Style encaustic, Ca' Pietra Victorian patterns) or retention, with Section 57 declaration coordination (€500-€2,000) and Limerick City and County Council Conservation Officer engagement where required.
VAT 13.5% reduced rate
Tiling as part of construction or renovation services attracts the 13.5% reduced VAT rate. Show VAT clearly on every quote. VAT services threshold €42,500; under threshold state 'Not VAT registered'.
UL student rental + pharma commercial volume
UL drives Castletroy June-September student rental bathroom turnaround; quote per-bathroom (€1,800-€4,500 tile and labour) at landlord portfolio rates. Pharma plus medtech commercial fit-out in Raheen (Regeneron) and Annacotty (Cook Medical) drives epoxy-grouted cleanroom-adjacent tile demand; quote at €55-€95/sqm with cleanroom protocol experience visible.
Sample quote
A real Limerick tiler quote you can copy
Full bathroom retile, walls + floor + shower niche, mid-range porcelain. Replace the line items and rates with your own; the structure stays.
Strip-out existing tile and grout (walls 22sqm, floor 6sqm)
Floor screed and level prep
Waterproofing membrane (Ardex or similar, walls and floor wet areas)
Wall tile (22sqm, porcelain 300x600 customer-choice)
Floor tile (6sqm, anti-slip porcelain 600x600 customer-choice)
Pencil trim in shower niche and external edges (8 linear m, brushed nickel)
Grout (epoxy, neutral grey, all joints) and silicone in corners
Tiling labour (4 days, 1 tiler)
FAQ
Limerick tiler pricing questions, answered
Common questions about tiler pricing in Limerick, with answers framed for tradies pricing their own work.
Per-sqm install (labour only): €40-€80 for standard Limerick, €70-€125+ for premium (Castletroy, South Circular Road, Ennis Road, Corbally, Annacotty) and large-format porcelain. Add tile material (€28-€300+/sqm depending on tier). Limerick rates run 25-30% below Dublin metro.
CIRI (Construction Industry Register Ireland) is mandatory for tax-compliant trading. Tile Association of Ireland (TAI) membership is the trust signal at premium tier. Print on every quote. Premium Castletroy, South Circular Road and Corbally customers expect documented credentials.
€3,800-€13,000 for an 8-12sqm Castletroy bathroom in tile and labour depending on tier. Includes substrate prep, tanking (€28-€60/sqm) with anti-mould additives, tile install (€70-€125/sqm), tile material (€45-€300+/sqm), and grouting. UL student or pharma fit-out production-rate work €1,800-€4,500 per bathroom.
Yes, always, on bathroom and wet-area jobs. IS EN 14411 and Building Regs Part L require tanking on wet-area substrates. Quote tanking (€28-€60/sqm with anti-mould additives) as separate line. Schluter Kerdi, Mapei Mapelastic AquaDefense, BAL Tank-it common spec.
Newtown Pery Protected Structures often retain original encaustic, Victorian patterned or Georgian flagstone floors. Quote sympathetic restoration (€80-€180/sqm), like-for-like reproduction (Original Style encaustic, Ca' Pietra Victorian patterns) or retention, with Section 57 declaration coordination (€500-€2,000) and Conservation Officer engagement where required.
Hourly rates are €35 to €63 in the US, £28-65 in the UK, A€39-110 in Australia, R180-500 in South Africa, and C€35-95 in Canada. Most tilers prefer fixed-price per square metre because it is more transparent and forces a clear scope conversation.
A standard 6-7sqm bathroom (walls + floor + shower) takes 5-7 working days from strip-out to grouting, plus 24-48 hours for waterproofing membrane cure and another 24 hours before the room can be used. Larger or pattern-heavy bathrooms run 7-10 days.
You can, and many customers do for design control. Just confirm with the tiler 1-2 weeks before start so the tile arrives on site in time and the colour matches across boxes. Customer-supplied tile usually voids tile-failure warranties; workmanship warranty stays.
For jobs over €1,400, get 2-3 quotes. Compare tile brand, waterproofing inclusion, substrate prep, pattern and edge detail. The cheapest quote often skips waterproofing or substrate prep, leading to failure within 3 years.
Ceramic is the cheapest and softest; OK for walls, marginal for floors. Porcelain is denser, harder, and frost-proof; the best all-rounder. Natural stone (marble, travertine, slate) is premium-priced, beautiful, and needs sealing before and after grouting.
Keep going
More tiler resources
The full international pricing guide, ready-to-send templates, and the main tilers page.
Full tiler pricing guide
International rates across 8 countries, plus all common jobs and a 10-question FAQ.
QuoteGenio for Tilers
Send branded quotes and invoices from your phone in 2 minutes. Built for tilers.
Tiler Quote Template
Tiler quote with liquid membrane warranty, substrate prep, and supply-and-lay rates.
Testimonials
Trusted by tradespeople in Limerick
Real tilers and other tradies in Limerick use QuoteGenio to quote and invoice from their phone.
“The templates look incredibly professional. My clients in Italy are always impressed by the branding. Huge time saver.”
Sofia Ricci
Interior Designer · Milan
“Converting a quote to an invoice in one click saves me so much time. Payment tracking is brilliant. I can see immediately who still owes me.”
Thabo Nkomo
HVAC Technician · Midrand
“Switched from a clunky desktop app. QuoteGenio is faster, simpler, and my crews actually use it. Payments tracking is a huge plus.”
Michael O'Brien
General Contractor · Denver, CO
Read more
Guides on pricing and quoting
Long-form posts from the QuoteGenio blog that go deeper on quote writing, pricing strategy, and getting paid.
What a Free Quoting Tool for Tradespeople Should Do
Not every free quoting tool for tradespeople earns its keep. A plain checklist of what to look for, what to avoid, and what tradies actually use.
Convert a Quote to an Invoice in One Tap, No Retyping
The one-tap convert flow eliminates the retyping, the duplicate invoice numbers, and the mismatched line items that cost tradies hours each week.
Voice to Quote: Dictate a Job, Get Priced Line Items
Hold the mic, describe the job in your own words, release. The AI drafts a priced quote. What Voice to Quote is, when to use it, and when not to.

Free forever plan
Start quoting faster. Win more jobs.
Create professional quotes in minutes, send instantly, and stay on top of your work without the admin slowing you down.
Free to start. No credit card required.
