
About the template
What this tiler quote template covers and why it wins more bathroom work
Tilers lose jobs in the quote when waterproofing is hidden inside the per-square-metre lay rate and substrate prep is left out. A bathroom retile that did not budget for self-levelling compound or liquid membrane runs over on labour, eats your margin, and ends in an argument over scope. The template below makes each layer of the install visible.
Strip existing tiles as its own line at a per-square-metre rate. Substrate repair and self-levelling separately, billed only on the metres that needed it. Liquid membrane waterproofing per square metre with the brand and warranty stated. Porcelain wall and floor tile (supply and lay) at the full rate. Trims, corner pieces, and grout/seal/clean down as their own lines. Each visible line stops the cheap competitor's quote making yours look expensive on the total.
What to include
Every tilers quote should have these lines
Use it as a checklist when you build your quote from scratch, or pull the QuoteGenio template that already has them.
Sample
A real tilers quote laid out properly
A worked example so you can see what a clean, structured version looks like before you write your own.
Quote sample
Bathroom retile, floor and walls (full height, 28 m² total)
Bill to
Alex Romero
+1 (555) 482 2917
55 Foxglove Drive, Cedar Park
From
Romero Tiling Co
+1 (555) 218 4060
14 Industrial Boulevard, Austin
Strip existing tiles and remove debris
Substrate repair and self-levelling compound
Liquid membrane waterproofing (supply and apply)
Porcelain wall and floor tile (supply and lay)
Matching trims, corner pieces, and silicone
Grout, seal, and clean down
Sample data shown in USD. QuoteGenio supports 40+ currencies and your branded business details, banking, and logo flow through automatically.
Use this template
Build your own tilers quote in 2 minutes
Your business name, logo, and banking details fill in automatically. Send the branded PDF via WhatsApp in one tap.
Avoid these
Common mistakes on tilers quotes
The patterns that quietly lose jobs, get queried at payment time, or leave money on the table.
Mistake: Waterproofing rolled into the lay rate
Better: Show liquid membrane per sq m as its own line with brand and warranty. Clients see the spec, and a 10-year warranty justifies the cost against a cheaper non-membrane quote.
Mistake: Substrate prep priced on all metres instead of only the ones that need it
Better: Quote substrate repair and self-levelling per sq m with the actual metres needing prep. Lump-sum prep on the whole area either overcharges (lost job) or undercharges (lost margin).
Mistake: Tile spec not named
Better: State the tile: porcelain, ceramic, rectified, large-format (600x1200). Each has different lay rates and waste percentages. Vague spec invites a price-shop on cheaper tile.
Mistake: No waste allowance
Better: Lay rate should bake in 7 to 10 percent cutting waste for standard formats, 12 to 15 percent for large-format or pattern lays. Otherwise the offcuts come out of your margin.
Mistake: No deposit for tile supply
Better: Take 40 percent on acceptance to cover tile purchase. Imported porcelain has lead times and is non-returnable once cut. State the deposit in the quote terms.
Mistake: Trims and grout absorbed into the tile line
Better: Show trims, corner pieces, silicone, grout, and clean down as separate lines. Each is a real cost and showing them stops the client thinking 'just tiles' is the whole price.
FAQ
Tilers quote template questions
Everything tilers ask before they switch to a structured quote.
Strip-out per sq m, substrate prep, liquid membrane per sq m with brand and warranty, tile spec named, supply and lay per sq m, trims and grout as separate lines, tax line, deposit terms, and banking details.
No. Quote it per sq m and bill on the actual metres that need it. Old screed and uneven floors need self-levelling; sound substrate does not. Show the rate but only bill what is used.
40 percent on acceptance is standard for jobs over a few hundred dollars, because tile is non-returnable once cut and imported lines have lead times. State it in the quote terms.
Always. Brand and warranty matter (Mapei, Laticrete, generic). A 10-year warranty justifies the price against a cheaper non-membrane quote and stops the conversation about whether membrane was 'really needed'.
Higher lay rate ($ 95 to $ 130 per sq m vs $ 60 to $ 90 for standard) plus higher waste allowance (12 to 15 percent vs 7 to 10). State both on the quote so the price is defensible against a standard-format quote.
Quote labour only at the per-sq-m lay rate plus prep and grout. State that you cannot warranty the tile itself (cracking, lippage) when supplied by the client. Lay warranty stays with you.
Related templates
Other flooring & tiling templates
Same hub, different trade and same itemised format, ready to send via WhatsApp.
Tiler Invoice Template
Tiler invoice with prep on actuals, membrane warranty, and tile spec.
Flooring Installer Quote Template
Flooring quote with uplift, subfloor prep, underlay, board grade, and install labour.
Flooring Installer Invoice Template
Flooring invoice with uplift, prep on actuals, board grade, and install labour confirmed.
Testimonials
Trusted by tradespeople
Real tilers and other tradespeople use QuoteGenio to quote and invoice in minutes from their phone.
“I used to delay sending quotes because it took too long. Now I do it straight after the job and get faster responses.”
Warren Jacobs
Plumber · Geneva
“Emergency call-outs at 2am are the worst time to write a quote. Being able to send something formal from my phone in a minute has saved me more than once.”
David Romano
Locksmith · Toronto
“The WhatsApp sending is a game changer. Most of my clients do not check email, so being able to send quotes instantly helps me get quicker responses.”
Kyle Adams
Electrician · Berlin
From the blog
Guides on writing better tilers quotes
Hand-picked posts that go deeper on the topics covered in this template.
How to Write a Tiling Quote That Protects Your Margin
Tiling margins die in the details. Here is how to write a tiling quote that covers prep, wastage, and the awkward cuts clients never notice.
How to Price a Job by Square Metre
Pricing by square metre is fast and familiar, but only works if you know your real rate. Here is how to calculate it correctly and avoid costly mistakes.
What to Include in Every Quote (Complete Checklist)
A field tested checklist of every line item, term, and detail that should be on your quotes so you stop losing jobs and arguments.
Free forever plan
Start quoting faster. Win more jobs.
Create professional quotes in minutes, send instantly, and stay on top of your work without the admin slowing you down.
Free to start. No credit card required.

