QuoteGenio logoQuoteGenio
Free Paving Contractors quote template ready to send via WhatsApp
Free Paving Contractor Quote Template

Free Paving Contractor Quote Template

An itemised paving quote template for driveways, patios, and pathways. Sub-base build-up, paver spec, edge restraint, jointing, and excavation itemised so the customer sees the real cost behind the headline price.

No credit card required

About the template

What this paving quote template covers and why it wins more driveways

Paving quotes lose work when 'supply and lay at $ 60 per sqm' is the only line. A homeowner gets three quotes; the one that shows the excavation depth, the sub-base build-up, the edge restraint, the paver brand, and the jointing material reads as the most professional.

The template itemises an 80 sqm driveway: 250mm excavation, 150mm Type 1 sub-base, 50mm laying course, brand-named concrete pavers, perimeter edge restraint, kiln-dried sand jointing, and removal of spoil. Each visible line makes the quote auditable.

What to include

Every paving contractors quote should have these lines

Use it as a checklist when you build your quote from scratch, or pull the QuoteGenio template that already has them.

Paving type (block paving, slabs, gravel, resin)
Total area in square metres
Excavation depth and spoil removal
Sub-base build-up (Type 1, MOT, depth stated)
Laying course material and depth
Paver brand, finish, and colour
Edge restraint (concrete haunch or kerb)
Jointing material (kiln-dried sand, polymeric, mortar)
Removal of existing surface if applicable
Tax line if registered, deposit (typically 30-40%)

Sample

A real paving contractors quote laid out properly

A worked example so you can see what a clean, structured version looks like before you write your own.

Quote sample

80 sqm block paved driveway with edge restraint

Quote #Q-000042

Bill to

Hannah Vorster

+1 (555) 408 7126

92 Highland Drive, Austin

From

Vorster Paving Co

+1 (555) 220 1184

9 Yard Lane, Cedar Park

Excavation to 250mm and spoil removal (80 sqm)

Qty 80·Rate R364 / sqmR29,088

Type 1 sub-base (150mm compacted, supply and lay)

Qty 80·Rate R463 / sqmR37,020

Laying course (50mm sharp sand, screeded)

Qty 80·Rate R198 / sqmR15,866

Concrete block pavers (Marshalls Drivesett, charcoal)

Qty 80·Rate R793 / sqmR63,464

Perimeter edge restraint (concrete haunch, 35m)

Qty 35·Rate R297 / mR10,412

Kiln-dried sand jointing and compaction

Qty 80·Rate R99 / sqmR7,933
SubtotalR163,783
Tax (10%)R16,378
TotalR180,161
Quote valid for 30 days. To accept, reply to this WhatsApp message or tap the link.

Sample data converted from USD to ZAR at indicative rates. QuoteGenio supports 40+ currencies and your branded business details, banking, and logo flow through automatically.

Use this template

Build your own paving contractors quote in 2 minutes

Your business name, logo, and banking details fill in automatically. Send the branded PDF via WhatsApp in one tap.

Avoid these

Common mistakes on paving contractors quotes

The patterns that quietly lose jobs, get queried at payment time, or leave money on the table.

Mistake: Quoting one rate per sqm with no breakdown

Better: Itemise excavation, sub-base, laying course, and pavers. Cheap quotes always cut on sub-base depth.

Mistake: Sub-base depth not stated

Better: 150mm Type 1 is the minimum for a driveway. State the depth or risk sinking pavers in 18 months.

Mistake: Edge restraint missing

Better: Without a concrete haunch or kerb, the perimeter walks out. Quote as its own line so the client sees the protection.

Mistake: Paver brand not named

Better: Marshalls, Brett, and budget pavers differ in colour-fastness and warranty. Name the brand and finish.

Mistake: No spoil removal line

Better: 80 sqm of excavation produces 20 tons of spoil. Quote removal as its own line so the client sees the disposal cost.

Mistake: Cure time not communicated

Better: State 'driveway can be walked on after 24 hours, driven on after 72 hours'. Avoids customer rolling over fresh pavers.

FAQ

Paving Contractors quote template questions

Everything paving contractors ask before they switch to a structured quote.

Area, excavation depth, sub-base depth, laying course, paver brand, edge restraint, jointing, spoil removal, tax, deposit, validity, and banking.

Yes. 30-40% on acceptance covers paver supply and aggregate delivery. Without it, you fund the materials.

30 days. Cement and paver prices move quickly. Longer validity means you absorb material price increases.

5 years on workmanship is standard for driveway paving. Pavers themselves carry the manufacturer's warranty (typically 10-25 years on colour).

Yes. PDF via WhatsApp with the layout sketch attached. Most paving jobs are decided within 1-2 weeks.

Walk on after 24 hours. Drive on after 72 hours. Cure time is firm and premature use lifts pavers.

Testimonials

Trusted by tradespeople

Real paving contractors and other tradespeople use QuoteGenio to quote and invoice in minutes from their phone.

“I used to forget to follow up on quotes. Now I can see what has been viewed, approved, or still pending. Makes my workflow much easier.”

Brandon Daniels

Installer · Paris

“Insurance companies want clear itemised quotes. Mine used to be handwritten and got rejected. Now they look proper and get approved first time.”

Rashid Omar

Panel Beater · Durban

“Before this, I was writing quotes in a notebook and sending photos. Now everything looks professional and clients take me more seriously.”

Deon Kruger

Plumber · Centurion

Tradesperson sending a QuoteGenio quote from a mobile phone

Free forever plan

Start quoting faster. Win more jobs.

Create professional quotes in minutes, send instantly, and stay on top of your work without the admin slowing you down.

Free to start. No credit card required.