Solar installer pricing in New York City
What solar installers charge in New York City (typically $2000-$3500/hr), the local factors that move the rate, and a sample quote you can use as a starting point.
No credit card required
New York City solar installer pricing
What solar installers should charge in New York City
NYC solar is driven by Local Law 92/94 (sustainable roof requirement on new/renovated roofs) and Local Law 97 (carbon caps on buildings 25,000+ sqft). NYSERDA NY-Sun rebates and federal ITC (30% through 2032) drive demand. ConEd interconnection is required for grid-tied; lead times 4-12 weeks. Manhattan rooftop space is limited; community solar and BIPV (building-integrated PV) are growing. Per-kW installed cost runs $3.50-$5.50 fully installed.
Hourly rate
$2000-$3500
per hour, weekday daytime
Call-out fee
$1400-$3000
within standard radius
After-hours
1.5-2x
evening, weekend, holiday
Job pricing
What to charge for common solar installer jobs in New York City
Real-world price ranges for the jobs local tradies quote every week. Use the table as a starting point for your own quotes and adjust for parts, access, and your overheads. All figures in USD.
Site survey and quote
What's included
Most reputable installers survey free for systems over 4kW. Detailed shading and structural reports may be charged.
3kW grid-tied system
What's included
Includes 8-10 panels, string inverter, mounting, wiring, and commissioning. Suits small homes or single occupants.
5kW grid-tied system
What's included
Includes 12-15 panels, string or hybrid inverter, mounting, wiring, and commissioning. Most common residential size.
6.6kW grid-tied system (Australia)
What's included
Sized to match the most common rebate threshold. Includes 16-18 panels and inverter. Battery-ready hybrid inverter adds $500-1,500.
10kW grid-tied system
What's included
Includes 24-28 panels, 8-10kW inverter, mounting, wiring, and commissioning. Best for larger homes or pool households.
Battery add-on (10-13kWh)
What's included
Includes battery, hybrid inverter upgrade if needed, electrical connection, and commissioning. Tesla Powerwall and BYD Premium at the top.
EV charger add-on (Level 2)
What's included
Smart EV charger integrated with solar to use excess power. Includes charger, dedicated circuit, and commissioning.
Annual system check + clean
What's included
Includes panel clean, inverter check, performance review, and report. Required by many warranties to remain valid.
Inverter replacement (mid-system life)
What's included
String inverters typically need replacement at 10-12 years. Includes new inverter, removal of old, and recommissioning.
New York City quote factors
What to factor into your New York City solar installer quote
Local context that should shape what you quote as a solar installer in New York City. Humid continental. Cold snowy winters (December-March, often below freezing), hot humid summers (July-August often above 90°F), coastal exposure on Manhattan/Brooklyn/Queens waterfronts. Hurricane Sandy flood-zone retrofits ongoing. Pipes freeze in winter, AC load peaks in July.
Local Law 92/94 compliance angle
NYC Local Laws 92 and 94 require new and substantially renovated roofs to be sustainable: green roof, solar, or cool roof. Quote solar as Local Law 92/94 compliance path; combined with Local Law 97 carbon caps, this is a high-margin sales angle. Building managers and co-op boards already need a sustainability path.
NYSERDA NY-Sun rebate
NYSERDA NY-Sun provides per-kW rebates for residential and small commercial solar in NYC. As of {YEAR}, the program is partially exhausted in NYC; check sector and zip code at NYSERDA before quoting. Federal ITC (30% through 2032) is separate. Quote the rebate as a line on the customer's net cost; conversion rate doubles when rebate is visible.
ConEd interconnection
Grid-tied solar in NYC requires ConEd interconnection approval. Lead times 4-12 weeks for residential, 8-20 weeks for commercial. Quote ConEd interconnection ($500-$3,500) as a separate line on every grid-tied install. State the lead time on the contract; ConEd delays are outside your control.
Co-op and condo board approval
Rooftop solar on co-op and condo buildings needs board approval (6-12 weeks). Quote alteration agreement legal review ($500-$2,500), engineer's letter ($2,500-$10,000), and board-required insurance ($1M-$5M general liability) as separate lines. Board experience is a key differentiator.
Per-kW installed cost
NYC residential and small commercial solar runs $3.50-$5.50 per watt installed ($3,500-$5,500 per kW). Above-average compared to national $2.50-$3.50 due to NYC labor rates, permitting complexity, and rooftop access difficulty. Premium installers (battery storage, smart-monitoring, branded panels) at $4.50-$6.50 per watt.
Battery storage growing
NYC battery storage growing fast post Sandy and after recent grid outages. Quote battery storage (Tesla Powerwall 3, Enphase IQ Battery, LG Resu, FranklinWH) at $10,000-$25,000 per battery installed. Building managers and high-net-worth Manhattan/Brooklyn brownstone clients pay readily for resilience.
Sample quote
A real New York City solar installer quote you can copy
6.6kW residential rooftop solar, grid-tied, premium tier-1 panels. Replace the line items and rates with your own; the structure stays.
16 x Jinko Tiger Neo N-type 415W panels (25-year product, 30-year power warranty)
Fronius Primo 6.0 string inverter (10-year warranty)
Tile roof mounting system (Schletter or equivalent)
Wiring, isolators, monitoring, DB board integration
Installation labour (2 days, 3-person CEC-licensed team)
Permits, grid connection application, certificate of compliance
System commissioning + customer monitoring app setup
Federal rebate (deducted at point of sale)
FAQ
New York City solar installer pricing questions, answered
Common questions about solar installer pricing in New York City, with answers framed for tradies pricing their own work.
$3,500-$5,500 per kW installed for residential and small commercial. Premium tier (battery storage, smart monitoring, branded panels) $4,500-$6,500 per kW. State whether grid-tied or hybrid (battery), inverter brand, and panel brand on every quote. NYC labor and permitting drive premium above national average.
NYC Local Laws 92 and 94 require new and substantially renovated roofs to be sustainable: green roof, solar, or cool roof. Quote solar as Local Law 92/94 compliance path; combined with Local Law 97 carbon caps, this is a high-margin sales angle. Building managers and co-op boards need a sustainability path.
NYSERDA NY-Sun provides per-kW rebates for residential and small commercial solar in NYC. As of {YEAR}, program is partially exhausted in NYC; check sector and zip code at NYSERDA before quoting. Federal ITC (30% through 2032) is separate. Quote the rebate as a line on net cost; conversion rate doubles when rebate is visible.
Grid-tied solar requires ConEd interconnection approval. Lead times 4-12 weeks for residential, 8-20 weeks for commercial. Quote ConEd interconnection ($500-$3,500) as a separate line on every grid-tied install. State the lead time on the contract; ConEd delays are outside your control.
Rooftop solar on co-op and condo buildings needs board approval (6-12 weeks). Quote alteration agreement legal review ($500-$2,500), engineer's letter ($2,500-$10,000), and board-required insurance ($1M-$5M general liability) as separate lines. Board experience is a key differentiator.
Per kW installed in {YEAR}: $1,200 to $2,500 in the US, £1,200-2,000 in the UK, A$900-1,800 in Australia, R18,000-35,000 in South Africa, and C$2,400-3,800 in Canada. Larger systems get cheaper per-kW due to scale; tier-1 panels and premium inverters push toward the top.
Most 3-bed homes need 5-8kW; 4-bed+ homes with pool or EV need 8-12kW. Look at your last 12 months of electricity bills, divide annual kWh by 1,300 (Australia/SA), 950 (UK/Canada), or 1,200 (US average). That gives kW capacity to offset most of your bill.
Depends on your feed-in tariff. Where FIT is high (Australia historically), batteries have 10-12 year payback; export to grid is more valuable. Where blackouts are common (South Africa) or FIT is low (UK), batteries pay back faster and add resilience. Quote both options.
A standard 5-10kW residential install is 1-2 days on the roof for a 3-person team, plus grid connection paperwork (1-6 weeks depending on utility). Larger systems and commercial installs take 3-7 days.
Site visits and verbal quotes for systems over 4kW are usually free. A detailed shading analysis, structural roof report, and load-flow calc for a 20kW+ commercial system takes 4-8 hours and may be charged $300-1,500. Worth it on large projects.
Keep going
More solar installer resources
The full international pricing guide, ready-to-send templates, and the main solar installers page.
Full solar installer pricing guide
International rates across 8 countries, plus all common jobs and a 10-question FAQ.
QuoteGenio for Solar installers
Send branded quotes and invoices from your phone in 2 minutes. Built for solar installers.
Solar Installer Quote Template
Solar quote with panel and inverter brand, battery kWh, mounting, and COC.
Testimonials
Trusted by tradespeople in New York City
Real solar installers and other tradies in New York City use QuoteGenio to quote and invoice from their phone.
“Wedding packages have so many variables. Sharing a quote on WhatsApp and getting acceptance in the same hour has won me bookings I would have lost.”
Elena Ortiz
Wedding Photographer · Barcelona
“Everything is in one place now. Quotes, invoices, and payments. I do not have to chase paperwork anymore, which saves me a lot of time.”
Liam Smith
Builder · New York City
“Steel fabrication quotes are technical. Clients appreciate when line items are clear and VAT is shown properly. Feels more like dealing with a real business.”
Matthias Schulz
Steel Fabricator · Hamburg
Read more
Guides on pricing and quoting
Long-form posts from the QuoteGenio blog that go deeper on quote writing, pricing strategy, and getting paid.
What a Free Quoting Tool for Tradespeople Should Do
Not every free quoting tool for tradespeople earns its keep. A plain checklist of what to look for, what to avoid, and what tradies actually use.
Convert a Quote to an Invoice in One Tap, No Retyping
The one-tap convert flow eliminates the retyping, the duplicate invoice numbers, and the mismatched line items that cost tradies hours each week.
Voice to Quote: Dictate a Job, Get Priced Line Items
Hold the mic, describe the job in your own words, release. The AI drafts a priced quote. What Voice to Quote is, when to use it, and when not to.

Free forever plan
Start quoting faster. Win more jobs.
Create professional quotes in minutes, send instantly, and stay on top of your work without the admin slowing you down.
Free to start. No credit card required.