Overview
Pool installation is sold by the shell, and the excavation is the line that doubles the cost on rocky ground
Pool installers fit pre-fabricated or kit-form swimming pools: fibreglass shells lifted into a prepared hole, vinyl-liner pools assembled from steel or polymer panels, and the small above-ground pools that don't need excavation. The customer is a homeowner who wants a domestic pool without the cost of a custom concrete build. The work is part excavation (the part where rocky ground, high water table, or restricted access can double the price overnight), part install (placing the shell or building the structure, levelling, plumbing, electrical), part landscaping (the surround, coping, deck or paving). A flat 'pool install, $24,000' quote without the excavation contingency, the access plan, and the surround scope misses what the customer's garden will actually require.
QuoteGenio gives pool installers a quoting shape built for prefab and kit work. Site survey and ground assessment as the first line, pool shell or kit by brand and size, excavation by cubic metre with rock or high water table contingency, base preparation, plumbing and pump installation, electrical and lighting, surround and coping, optional safety fence and cover as separate records, and chemical commissioning. Send via WhatsApp or email to the homeowner with renders and the contingency clause explained, take staged deposits, raise progress invoices through excavation, install, and commissioning, and the final invoice closes with the pool filled, balanced, and ready to swim.
Who it is for
Who uses QuoteGenio
Built for every type of pool install and pool build business.
The problem
The quoting headaches every pool installer knows
Pools price on size (m³), shell type, liner, filtration, and excavation. One big number hides every choice and the client picks the cheapest bidder.
Site to quote takes weeks
You measure the garden, then sit on the quote while you check shell pricing and excavator availability. By then the client has signed up the next bidder.
Lump-sum hides the spec
If your quote is 'R1,570,065 for a pool', the client cannot tell whether they get a fibreglass shell or a concrete dig. You lose to bidders quoting cheaper specs.
No visible upgrade path
Salt vs chlorine, heat pump vs solar, LED lights, automatic cover. If these are not on the quote as upgrades, you cannot upsell from the base spec.
The fix
QuoteGenio makes it simple
A workflow built around how pools are scoped, with line items for excavation, shell, liner, filtration, and finishes.
The payoff
What you get with QuoteGenio
The everyday wins that add up across a year of quoting and invoicing.
Built for pool installers
Line items for excavation, shell, liner, filtration, plumbing, lighting, paving, and commissioning. Everything a pool quote needs, nothing it does not.
Works from your phone
Quote at the dig site with the m³ and shell choice still in hand. No driving back to the office to write it up over the next two days.
Quote in under 2 minutes
Save pool sizes and shell types as templates. Pick the size, choose the shell, send. Done before the client meets the next bidder.
Staged payments tracked
Take 30 percent on dig, 30 percent on shell delivery, 30 percent on tile and plant, 10 percent on commissioning. See every stage paid or pending without a spreadsheet.
Built for your trade
Quoting calibrated to how pool installers actually work
Pick your trade in Settings and the entire quote flow switches to fit. Line item presets, compliance fields, on-the-quote calculators, and per-m² / after-hours pricing all change to match your industry.
Trade-specific line items
Quick add picker pre-fills the common items your trade quotes. Skip the blank rows.
Brand-specific catalogues
Pylontech, Hikvision, Canadian Solar, Sunsynk and others pre-named. Pick the brand, the description writes itself.
Compliance fields built in
IOPSA, ECASA, PIRB, PSIRA, NHBRC, SAQCC. Set once. Every quote prints them under FROM.
Registration expiry alerts
Dashboard notification 60 days before your PSIRA, CoC or any dated registration lapses.
Per-m² / hour / day billing
Unit selector on every line item: m², hr, linear m, days. Stop doing the maths externally.
After-hours and emergency
1.5× and 2× multipliers as a one-tap toggle. Customer sees the breakdown on the quote.
Quote-flow calculators
Solar size, battery backup, cable run cost. Compute on the spot, drop straight onto the quote.
Staged payments
Deposit on acceptance + balance on completion as two separate amounts on the quote PDF.
Scope-of-work checklist
Structured Included / Not included lists. Client acceptance = signing the scope.
Site-survey mode
Log a location per line item: camera positions, fixtures by room, sensors by zone.
Regional rate hints
Pricing ranges per item per currency shown as you quote.
Free on every plan
All of the above included on the free plan. Premium is for capacity, not the trade tooling.
Why QuoteGenio
Why Pool Installers choose QuoteGenio
The tools that matter most when you are quoting on-site, under pressure, and between jobs.
Quote from your phone
Most Pool Installers build and send quotes directly from the job site. No laptop, no office, no delays.
Win more jobs, faster
The first professional quote a client receives usually wins. Respond in minutes, not hours.
Quote to invoice in one click
When the job is accepted, convert to an invoice instantly. No retyping, no double entry.
Pricing guide
Typical Pool Installers job pricing
A rough guide to what pool installers charge. Pricing varies massively with shell type (fibreglass, concrete, vinyl), m³, access, ground conditions, and finishes. Use these as a sanity check when building your own rates, not as fixed numbers.
| Job | Typical range |
|---|---|
| Small fibreglass plunge pool (under 8 m³, supply only) | R79,330 - R198,324 |
| Standard fibreglass shell (16 m³, supply only) | R140,480 - R363,594 |
| Excavation and crane in (per m³ of dig) | R3,636 - R7,933 |
| Concrete pool shell and gunite (per m³ of pool) | R29,749 - R57,845 |
| Marble or pebble plaster finish (per m² of shell) | R4,628 - R10,743 |
| Filtration system (sand filter, pump, plumbing) | R74,372 - R198,324 |
| Salt chlorinator upgrade (over standard chlorine) | R52,886 - R140,480 |
Pricing converted from USD to ZAR at indicative rates. Rates vary significantly by country, region, currency, and market.
Call-out fees
A site survey and design fee of R5,784 to R14,048 covers your time to assess access, ground conditions, drainage, and to sketch the layout. Most pool installers credit it against the build if the project goes ahead. List it on the quote so tyre-kicker enquiries respect your time.
Hourly vs fixed pricing
Use fixed pricing per pool m³ for the shell, install, and filtration packages. Use day rates for excavation and crane (R29,749 to R74,372 per day). Use a hybrid (fixed plus provisional) for ground conditions, where rock, water table, or buried obstructions can blow the dig budget.
See it in action
Example quote breakdown
Here is what a clean fibreglass pool quote looks like. Notice how survey, excavation, shell, install, filtration, and upgrades all show as their own lines. Clients accept this kind of quote faster because they can see exactly what they get for each rand and where they can upgrade or downgrade.
Try it yourself
Job size
Region
Sample quote
Fibreglass family pool, 32 m³ (8 x 4 x 1.4 m average)
Site survey, design and engineering sign-off
Excavation and crane in (32 m³ dig)
Fibreglass shell supply (32 m³ family pool)
Backfill, base prep and shell install labour
Filtration system (sand filter, pump, plumbing)
Salt chlorinator and LED lights (2 x lights)
| Description | Qty | Rate | Total |
|---|---|---|---|
| Site survey, design and engineering sign-off | 1 | R14,048 | R14,048 |
| Excavation and crane in (32 m³ dig) | 32 | R5,289 | R169,236 |
| Fibreglass shell supply (32 m³ family pool) | 1 | R471,020 | R471,020 |
| Backfill, base prep and shell install labour | 1 | R211,546 | R211,546 |
| Filtration system (sand filter, pump, plumbing) | 1 | R140,480 | R140,480 |
| Salt chlorinator and LED lights (2 x lights) | 1 | R102,467 | R102,467 |
| Subtotal | R1,108,796 | ||
| Tax (10%) | R110,880 | ||
| Total incl. tax | R1,219,676 | ||
Totals recalculate as you change the controls above. Tax rate inferred from the sample quote.
Items often forgotten
Engineering sign-off, soil tests where required, crane standby if access is tight, backfill material, perimeter coping and tiling, fence compliance for child safety, the first chemical balance, and the commissioning hand-over. Add these as standard lines on your pool template so you stop absorbing them out of your margin.
Peer snapshot
How Pool Installers actually use QuoteGenio
Indicative activity for Pool Installers on the platform. Use it as a benchmark for how often to quote and how fast to respond.
28
Quotes sent per month
46%
Average quote acceptance
2 min
Median time to send quote
R1,219,676
Typical quote value
Figures are indicative platform averages for this trade segment.
Start quoting Pool Installer jobs like this, free
Build your first quote in under 2 minutes. No credit card, no setup fee, no contract.
Avoid these
Common quoting mistakes
We talk to a lot of pool installers. The same pricing and scoping mistakes come up again and again. Fixing these will protect your margin, your cashflow, and your reputation.
Mistake: Quoting a pool as one number
Better: Always break out excavation, shell, install, filtration, and finishes as separate lines. A lump-sum quote loses to a structured quote because the client cannot see what they get.
Mistake: No allowance for ground conditions
Better: Add a 'ground condition adjustment' clause stating that rock, water table, or buried obstructions are billed at standard excavation day rates. Otherwise a hard dig blows your fixed price.
Mistake: Forgetting the engineering sign-off
Better: Pools over a certain size or near boundary walls need engineering sign-off. Quote it as a R13,222 to R41,318 line. Skipping it leaves you exposed at COC stage and the client blames the installer.
Mistake: No fence compliance line
Better: Pool fencing or net is a legal requirement in most areas. Quote it as a separate line item. Hiding it in 'install' makes the client think it is free, then you absorb it at the end.
Mistake: Cheap filtration to win the quote
Better: Spec proper filtration (sand filter sized to pool m³, pump matched to flow). Cheap filtration leads to green water in month 2 and the client blames the install. Quote the right size with the brand named.
Mistake: Skipping the commissioning line
Better: Pool commissioning (chemical balance, filter prime, system test) is a real day on-site. Quote it as a R14,048 to R41,318 line. The client appreciates seeing it priced because it explains the hand-over.
Mistake: No staged payment schedule
Better: Pools are big builds. Set 30 percent on dig, 30 percent on shell delivery, 30 percent on tile and plant, 10 percent on commissioning. State all four payments on the quote so the client agrees in writing.
Mistake: No follow-up after sending the quote
Better: Most quotes that don't close, don't close because nobody followed up. Send a polite check-in 48 hours after the quote lands, and a second nudge at day 7. Two of every three accepted quotes get there because someone followed up.
Step by step
How to quote pool installation jobs
Survey the site properly before you price. Measure the proposed pool footprint and calculate volume in cubic metres, check access width for an excavator and crane, probe the ground for rock and water table, look for buried services, and note proximity to boundary walls. Decide with the client at site between fibreglass (1 to 3 week install, lower cost, standard shapes) and concrete (8 to 16 week install, premium finishes, any shape). Photograph the ground conditions as your evidence base for the ground clause. Ask about upgrades: salt chlorinator, heat pump or solar heating, LED lights, automatic cover. These decisions move turnkey from $ 65,000 for a 32 cubic metre fibreglass family pool to $ 180,000 for a concrete pool with premium finishes.
Itemise every stage. Line items for site survey and design and engineering sign-off, excavation and crane in per cubic metre of dig, shell supply (fixed price per shell size), backfill and base prep and shell install labour, filtration system (sand filter sized to volume, pump matched to flow, plumbing), salt chlorinator upgrade, LED lights, coping and tiling per m squared, fence or net compliance, and commissioning day. State shell brand and warranty on the quote, and size the filtration sand filter to the pool cubic metres with pump flow rate matched. Add a 'ground condition adjustment' clause stating that rock, water table, buried foundations or unmapped services are billed at the agreed excavation day rate of $ 1,800 to $ 4,500 per day so a hard dig does not blow your fixed price.
Use 30 day validity because pool shells, filtration, and crane hire move with import shipments and seasonal demand. Take staged payments: 30 percent on dig, 30 percent on shell delivery, 30 percent on tile and plant, 10 percent on commissioning, with all four stages stated on the quote so the client agrees in writing. Quote engineering sign-off at $ 800 to $ 2,500 for pools over 12 cubic metres, pools near boundary walls, or pools on sloped sites. State your install workmanship warranty of 1 to 2 years alongside the manufacturer shell warranty. Include a first chemical balance and hand-over walk-through on the commissioning line.
Send the structured quote on WhatsApp from the proposed dig site so the homeowner sees your work before the next bidder arrives. Pool buyers compare two or three builders over weeks, and the one who quotes first with a professional line-by-line structure usually wins even at a higher price. Build on your phone during the survey, share the PDF link from site, and follow up after 5 days with a message referencing the specific pool shape and volume. When upgrades come up after acceptance (heat pump, automatic cover, bigger shell), send a variation quote and reset only the affected stage deposit.
FAQ
Common questions from pool installers
Everything you need to know before getting started.
Yes. Set quantity to your pool m³ and rate to your per m³ price for excavation. Add separate lines for shell, install, filtration, and finishes so the client sees every component of the build.
Yes. Once your quote is ready, share it as a link directly via WhatsApp. Your client gets a professional branded document instantly, before you drive home from the survey.
Each line item has its own description, quantity, and price. Add a line per build component (excavation, shell, install, filtration, lighting, finishes). The client sees exactly what each part costs and can choose upgrades at acceptance.
Yes. Every quote has a unique public link. Your client can open it on their phone and accept it online. No signup required.
Yes. Convert the accepted quote into a series of invoices (one per build stage). Each invoice links back to the original quote so there is no double entry, and you can see at a glance which stages are paid.
Yes. The free plan gives you 5 quotes and 2 invoices per month with no credit card required. Upgrade to Premium for unlimited quotes, invoices, statements, and reports.
Excavation prices per m³ of dig (R3,636 to R7,933 per m³ in standard ground). Shell and install price per pool size (the supply price is fixed per shell, the install price varies with access). Filtration prices per pool m³ (sized to flow rate). Finishes price per m² of shell. Total turnkey for a standard 32 m³ family pool lands at R1,074,255 to R1,817,970 in fibreglass and R1,570,065 to R2,974,860 in concrete.
Quote both as options on separate quotes if the client is undecided. Fibreglass is faster to install (1 to 3 weeks), lower upfront cost, and easier to maintain. Concrete is more flexible on shape, longer install (8 to 16 weeks), higher cost, and offers premium finishes. State the trade-offs in the cover note so the client picks based on use, not just price.
Often yes, especially for pools over 12 m³, pools near boundary walls, or pools on sloped sites. A structural engineer's sign-off costs R13,222 to R41,318 and is required by most municipalities at COC stage. Quote it as a line item upfront so the client expects the cost and you are not absorbing it on completion.
State on the quote that excavation is priced for standard dry ground. Rock, water table, buried foundations, or unmapped services are billed at the agreed excavation day rate (R29,749 to R74,372 per day). Get the client's signature on this clause at quote stage so a hard dig does not blow your margin or cause a payment dispute.
Still have questions? We would rather answer them now than after you have signed up.
Explore more
Related trades in Pool & Spa Services
QuoteGenio is built for a whole family of trades. Explore other pages that might fit how you work.
Reviews
Trusted by tradespeople
Real feedback from people who quote for a living.
"My quotes look a lot more professional now. Clients take them seriously and I spend less time formatting documents."
Megan Daniels
Interior Designer · Birmingham
"Quoting per square metre used to take me forever. I have templates set up now that cover lawn, pavers, and planting separately. Cuts my admin in half."
Nathan Walsh
Landscaper · Melbourne
"I used to forget to follow up on quotes. Now I can see what has been viewed, approved, or still pending. Makes my workflow much easier."
Brandon Daniels
Installer · Paris
Guides
Guides for Pool Installers
Practical advice to help you quote better, get paid faster, and grow your business.
Free forever plan
Start quoting faster. Win more jobs.
Create professional quotes in minutes, send instantly, and stay on top of your work without the admin slowing you down.
Free to start. No credit card required.