
Builder pricing in Wexford
What builders charge in Wexford (typically €40-€115/hr), the local factors that move the rate, and a sample quote you can use as a starting point.
No credit card required
Wexford builder pricing
What builders should charge in Wexford
Wexford builders work the heritage Norman walled town (Westgate Tower, Selskar Abbey, Bull Ring, town walls; Ireland's oldest urban Anglo-Norman heritage; Section 57 Protected Structures and ACA controls), premium coastal Rosslare (Y35), Ferrycarrig (Y35) heritage country house area, Forth Mountain (Y35) and Ardcavan (Y35) suburban premium, lifestyle-migration deep-retrofit extension work, plus Rosslare Europort logistics commercial new-build. CIRI (Construction Industry Register Ireland) and Safe Pass are mandatory. BCAR (Building Control Amendment Regulations) Assigned Certifier required for notifiable work.
Hourly rate
€40-€115
per hour, weekday daytime
Call-out fee
€28-€60
within standard radius
After-hours
1.5-2x
evening, weekend, holiday
Job pricing
What to charge for common builder jobs in Wexford
Real-world price ranges for the jobs local tradies quote every week. Use the table as a starting point for your own quotes and adjust for parts, access, and your overheads. All figures in EUR.
Site visit and written quote
What's included
Most established builders quote free for jobs over €4,000. Charge applies to large scope-of-work documents.
Garden wall (per linear metre)
What's included
Includes excavation, foundation, blockwork, and 2-3 days labour. Render and capping extra.
Internal wall removal (non-structural)
What's included
Includes demolition, debris removal, and make-good. Structural engineer report extra if load-bearing.
Concrete slab (per square metre)
What's included
Includes excavation, reinforcement mesh, formwork, concrete pour, and finish. Excludes site prep.
Single-storey room extension
What's included
Depends on size, fittings, and finish level. Excludes plumbing and electrical subcontract.
Bathroom renovation (full)
What's included
Includes demolition, plumbing, tiling, fixtures, and labour. Premium fittings add cost.
Kitchen renovation (full)
What's included
Depends on layout changes and cabinetry. Bench-tops, splashbacks, and appliances priced separately.
Retaining wall (per linear metre)
What's included
Depends on height and material (block, gabion, sleeper). Excavation and drainage extra.
Daily site labour (1 person)
What's included
Standard 8-hour day. Apprentice + qualified builder pair runs higher.
Wexford quote factors
What to factor into your Wexford builder quote
Local context that should shape what you quote as a builder in Wexford. Mild oceanic (Sunny South-East, Ireland's sunniest region). Mild winters (Dec-Feb, 4-9°C), mild summers (June-Aug, 16-21°C, occasional 25°C+), moderate rainfall (~900mm/year), Atlantic storm exposure. Coastal salt-air on Rosslare + Curracloe.
CIRI + Safe Pass + BCAR Assigned Certifier
CIRI (Construction Industry Register Ireland) registration is mandatory for tax-compliant trading. Safe Pass card mandatory on every operative on every site. BCAR Assigned Certifier mandatory for notifiable work (new dwellings, extensions over 40sqm, material alterations). Print CIRI number on every quote and invoice. HSA workplace health and safety enforcement applies.
Rosslare + Ferrycarrig + Forth Mountain + Ardcavan premium tier
Rosslare (Y35), Ferrycarrig (Y35), Forth Mountain (Y35) and Ardcavan (Y35) renovations run EUR 2,500-EUR 4,000/sqm. Ultra-premium heritage Norman (Westgate, Selskar Abbey area, Bull Ring, Wexford Quays Protected Structures inside the medieval walls) EUR 4,000-EUR 6,000/sqm. Standard Wexford (Wexford Town Centre non-heritage, Maudlintown, Bishopswater, Coolcotts, Whitemill) EUR 1,300-EUR 2,500/sqm.
Heritage Norman walled town Protected Structures
Wexford has Ireland's oldest urban Anglo-Norman heritage (founded by Vikings in the 800s, taken by Anglo-Normans in 1169). Westgate Tower (1300), Selskar Abbey, Bull Ring, town walls and Wexford Quays sit within an ACA. Many properties are Protected Structures under Section 57. Quote Section 57 declaration coordination (EUR 800-EUR 3,500), Wexford County Council Conservation Officer engagement, lime-mortar specification, sash window retention, period millwork and longer programme. Ultra-premium EUR 4,000-EUR 6,000/sqm.
Wexford County Council single planning authority
Wexford County Council covers the entire county under one planning authority. Quote planning application (EUR 65 householder, EUR 300 commercial) and BCAR Commencement Notice (EUR 30) as visible lines. Typical householder planning runs 8-12 weeks; commercial 13+ weeks; heritage referrals add 6-12 weeks. State that the quote falls under Wexford County Council on the contract.
NZEB + SEAI Heat Pump Grant EUR 6,500 + One Stop Shop
All new dwellings since 2019 must meet NZEB (Nearly Zero Energy Building). Major renovations (over 25% surface area) trigger NZEB. Quote heat pump retrofit (EUR 12,500-EUR 20,500 gross, EUR 6,000-EUR 14,000 net of SEAI EUR 6,500 grant), Solar PV (SEAI EUR 1,800 grant), HRV/MVHR, BER assessment as visible lines. SEAI One Stop Shop deep-retrofit pathway is heavily used in Wexford given the oil-heating legacy stock.
VAT 13.5% reduced rate construction
Construction and renovation services for residential property attract the 13.5% reduced VAT rate in Ireland (not the 23% standard). New dwellings also 13.5%. Show VAT 13.5% as a separate line on every quote. VAT services threshold EUR 42,500; under threshold state 'Not VAT registered'.
Sample quote
A real Wexford builder quote you can copy
Single-storey rear extension, 24sqm, standard finish. Replace the line items and rates with your own; the structure stays.
Site demolition, debris removal, and make-good
Concrete slab (24sqm) including reinforcement, formwork, and pour
Brickwork and external walls (24sqm) to lock-up
Roof structure, tiles, gutters, and insulation
Windows and external door (mid-grade aluminium frames)
Internal finishes (plaster, paint, skirting, cornice)
Builder labour and project management (24 days, 2-person team)
Permits, engineer sign-off, and council inspection
FAQ
Wexford builder pricing questions, answered
Common questions about builder pricing in Wexford, with answers framed for tradies pricing their own work.
Standard Wexford (Wexford Town Centre non-heritage, Maudlintown, Bishopswater, Coolcotts, Whitemill): EUR 1,300-EUR 2,500/sqm. Premium (Rosslare, Ferrycarrig, Forth Mountain, Ardcavan): EUR 2,500-EUR 4,000/sqm. Ultra-premium heritage Norman (Westgate, Selskar Abbey, Bull Ring, Wexford Quays Protected Structures): EUR 4,000-EUR 6,000/sqm. State CIRI registration on every contract.
Yes. CIRI (Construction Industry Register Ireland) is mandatory for tax-compliant construction trading. Safe Pass is mandatory on every operative on every Irish construction site. BCAR Assigned Certifier required for notifiable work. HSA enforces workplace safety. Print CIRI number on every quote and invoice.
Wexford has Ireland's oldest urban Anglo-Norman heritage. Westgate Tower (1300), Selskar Abbey, Bull Ring, town walls and Wexford Quays sit within an ACA. Many properties are Protected Structures under Section 57. Quote Section 57 declaration coordination (EUR 800-EUR 3,500), Wexford County Council Conservation Officer engagement, lime-mortar specification, sash window retention and longer programme. Ultra-premium EUR 4,000-EUR 6,000/sqm.
Wexford County Council covers the entire county. Householder planning runs 8-12 weeks; commercial 13+ weeks; heritage referrals add 6-12 weeks. Quote planning application (EUR 65 householder, EUR 300 commercial) and BCAR Commencement Notice (EUR 30) as visible lines. State that the quote falls under Wexford County Council on the contract.
Yes, the standout commercial vertical. Rosslare Europort is Ireland's main ferry port to the UK and France and drives warehouse, freight-handling and customs-clearance commercial work. Quote at EUR 2,000-EUR 4,200/sqm with full CIRI, Safe Pass, BCAR Assigned Certifier and HSA documentation visible.
Labour rates are €40 to €96 per hour in the US, £35-90 in the UK, A€60-150 in Australia, R250-700 in South Africa, and C€44-130 in Canada. Most builders prefer to quote fixed-price for jobs over €4,000 and reserve hourly for small repairs.
Builders bid differently on materials, labour mix, and contingency. A 'cheap' quote often skips proper foundations, uses sub-grade fixtures, or leaves the customer paying for variations later. Always compare scope and inclusions, not just totals.
Three for jobs over €8,000. Compare scope, materials, and the payment schedule, not just the headline number. If one is 30% cheaper than the others, it almost always means work is missing from the quote.
For build projects: 30% on signing for materials, 30% on slab/structure, 30% on lock-up (roof and walls complete), 10% on completion. Anyone asking for more than 30% upfront is a risk.
Yes, especially for jobs over €4,000. A contract sets scope, milestones, payment schedule, variation handling, and dispute resolution. Most regions require it by law over a threshold.
Keep going
More builder resources
The full international pricing guide, ready-to-send templates, and the main builders page.
Full builder pricing guide
International rates across 8 countries, plus all common jobs and a 10-question FAQ.
QuoteGenio for Builders
Send branded quotes and invoices from your phone in 2 minutes. Built for builders.
Builder Quote Template
Itemised builder quote with trades, provisional sums, and staged payment schedule.
Testimonials
Trusted by tradespeople in Wexford
Real builders and other tradies in Wexford use QuoteGenio to quote and invoice from their phone.
“The templates look incredibly professional. My clients in Italy are always impressed by the branding. Huge time saver.”
Sofia Ricci
Interior Designer · Milan
“Converting a quote to an invoice in one click saves me so much time. Payment tracking is brilliant. I can see immediately who still owes me.”
Thabo Nkomo
HVAC Technician · Midrand
“Switched from a clunky desktop app. QuoteGenio is faster, simpler, and my crews actually use it. Payments tracking is a huge plus.”
Michael O'Brien
General Contractor · Denver, CO
Read more
Guides on pricing and quoting
Long-form posts from the QuoteGenio blog that go deeper on quote writing, pricing strategy, and getting paid.
What a Free Quoting Tool for Tradespeople Should Do
Not every free quoting tool for tradespeople earns its keep. A plain checklist of what to look for, what to avoid, and what tradies actually use.
Convert a Quote to an Invoice in One Tap, No Retyping
The one-tap convert flow eliminates the retyping, the duplicate invoice numbers, and the mismatched line items that cost tradies hours each week.
Voice to Quote: Dictate a Job, Get Priced Line Items
Hold the mic, describe the job in your own words, release. The AI drafts a priced quote. What Voice to Quote is, when to use it, and when not to.

Free forever plan
Start quoting faster. Win more jobs.
Create professional quotes in minutes, send instantly, and stay on top of your work without the admin slowing you down.
Free to start. No credit card required.
