Builder pricing in Drogheda
What builders charge in Drogheda (typically €40-€115/hr), the local factors that move the rate, and a sample quote you can use as a starting point.
No credit card required
Drogheda builder pricing
What builders should charge in Drogheda
Drogheda builders work across coastal Termonfeckin, Beaulieu and Bettystown (A92) premium extensions and new-build, Drogheda Town Centre Norman walled heritage and Georgian terrace renovations on West Street and Shop Street (A92), Stockwell and Pearse Park interwar refurbishment, modern Mell and Newfoundwell subdivisions tied to Dublin commuter migration, and Boyne Valley UNESCO World Heritage Site (Newgrange, Knowth, Dowth) tourism-driven Airbnb conversion. CIRI (Construction Industry Register Ireland), Safe Pass and CIF Master Builders membership are the trust signals. BCAR Assigned Certifier mandatory above thresholds. NZEB since 2019. Louth County Council north of the Boyne, Meath County Council south.
Hourly rate
€40-€115
per hour, weekday daytime
Call-out fee
€28-€60
within standard radius
After-hours
1.5-2x
evening, weekend, holiday
Job pricing
What to charge for common builder jobs in Drogheda
Real-world price ranges for the jobs local tradies quote every week. Use the table as a starting point for your own quotes and adjust for parts, access, and your overheads. All figures in EUR.
Site visit and written quote
What's included
Most established builders quote free for jobs over €4,000. Charge applies to large scope-of-work documents.
Garden wall (per linear metre)
What's included
Includes excavation, foundation, blockwork, and 2-3 days labour. Render and capping extra.
Internal wall removal (non-structural)
What's included
Includes demolition, debris removal, and make-good. Structural engineer report extra if load-bearing.
Concrete slab (per square metre)
What's included
Includes excavation, reinforcement mesh, formwork, concrete pour, and finish. Excludes site prep.
Single-storey room extension
What's included
Depends on size, fittings, and finish level. Excludes plumbing and electrical subcontract.
Bathroom renovation (full)
What's included
Includes demolition, plumbing, tiling, fixtures, and labour. Premium fittings add cost.
Kitchen renovation (full)
What's included
Depends on layout changes and cabinetry. Bench-tops, splashbacks, and appliances priced separately.
Retaining wall (per linear metre)
What's included
Depends on height and material (block, gabion, sleeper). Excavation and drainage extra.
Daily site labour (1 person)
What's included
Standard 8-hour day. Apprentice + qualified builder pair runs higher.
Drogheda quote factors
What to factor into your Drogheda builder quote
Local context that should shape what you quote as a builder in Drogheda. Mild oceanic Atlantic. Mild winters (Dec-Feb, 3-8°C, occasional frost), cool summers (June-Aug, 15-20°C), moderate rainfall (~870mm/year), persistent wind. Atlantic storm season (Ophelia 2017, Emma 2018, Babet 2023). Boyne River flooding risk historic.
CIRI + Safe Pass + CIF Master Builders
CIRI (Construction Industry Register Ireland) registration is the legal default; Safe Pass cards are mandatory on every operative; CIF Master Builders membership and HomeBond / Premier Guarantee registration are the additional trust signals at premium tier. Print all relevant memberships on every quote.
Coastal Termonfeckin + Bettystown + Beaulieu premium tier
Coastal Termonfeckin, Beaulieu, Termon Hill (A92 Louth) and Bettystown (A92 Meath) renovations run €2,500-€4,000/sqm. Ultra-premium heritage (Beaulieu estate, listed coastal stock) €4,000-€6,000/sqm. Standard Drogheda (Town Centre, West Street, Stockwell, Pearse Park) €1,300-€2,500/sqm. State which council on the contract (Louth north of the Boyne, Meath south).
BCAR Assigned Certifier + NZEB since 2019
BCAR (Building Control Amendment Regulations) requires an Assigned Certifier (architect or engineer) on extensions over 40sqm, new dwellings and material alterations. NZEB (Nearly Zero Energy Building) compliance mandatory on new dwellings since November 2019: high insulation, airtightness <3m³/h.m², renewable contribution. Quote BCAR coordination (€2,500-€8,500) and NZEB design uplift as visible lines.
Louth + Meath County Council planning split
Drogheda's administrative quirk: Louth County Council covers north of the Boyne (Drogheda Town Centre, Termonfeckin, Beaulieu, Mell), Meath County Council covers south (Bettystown, Laytown, East Meath). Planning lead times 8-12 weeks both councils. Quote planning application (€65 householder, €580+ new build), local-authority levies and section-48 development contributions as visible lines and state which council on every contract.
Dublin commuter belt new-build + subdivision boom
M1 motorway and Drogheda commuter train (45 min to Dublin Connolly) drive sustained subdivision new-build in Mell, Newfoundwell, Bettystown and outer Termonfeckin. Quote tier-2 developer work (estate new-build, semi-detached, townhouse) at €1,300-€2,200/sqm with HomeBond / Premier Guarantee, NZEB compliance and BCAR Assigned Certifier coordination through the architect.
VAT 13.5% reduced rate + Boyne Valley UNESCO tourism Airbnb
VAT 13.5% (reduced rate for construction and installation services) applies to most building work; 23% on standalone materials supply. New dwellings 13.5%. Boyne Valley UNESCO World Heritage Site (Newgrange, Knowth, Dowth) drives strong Airbnb conversion of Drogheda Town Centre and coastal cottages; quote Airbnb-ready turnkey at +15-25% premium with rental yield economics in the proposal.
Sample quote
A real Drogheda builder quote you can copy
Single-storey rear extension, 24sqm, standard finish. Replace the line items and rates with your own; the structure stays.
Site demolition, debris removal, and make-good
Concrete slab (24sqm) including reinforcement, formwork, and pour
Brickwork and external walls (24sqm) to lock-up
Roof structure, tiles, gutters, and insulation
Windows and external door (mid-grade aluminium frames)
Internal finishes (plaster, paint, skirting, cornice)
Builder labour and project management (24 days, 2-person team)
Permits, engineer sign-off, and council inspection
FAQ
Drogheda builder pricing questions, answered
Common questions about builder pricing in Drogheda, with answers framed for tradies pricing their own work.
Standard Drogheda (Town Centre, West Street, Marsh Road, Stockwell, Pearse Park, Mell, Newfoundwell A92): €1,300-€2,500/sqm. Premium coastal (Termonfeckin, Beaulieu, Termon Hill, Bettystown A92): €2,500-€4,000/sqm. Ultra-premium heritage (Beaulieu estate, listed coastal stock, walled-town Section 57 Protected): €4,000-€6,000/sqm. State CIRI registration and Safe Pass on every contract.
Yes. CIRI (Construction Industry Register Ireland) registration is the legal default; Safe Pass cards are mandatory on every operative on site. CIF Master Builders membership and HomeBond / Premier Guarantee registration are the additional trust signals at premium tier in Termonfeckin and Bettystown. Print all on every quote.
Major works (extensions over 40sqm, new dwellings, material alterations) require an Assigned Certifier (architect or engineer) under BCAR. Quote BCAR coordination (€2,500-€8,500) on every qualifying job as a visible line. NZEB compliance mandatory on all new dwellings since November 2019: high insulation, airtightness <3m³/h.m², renewable contribution required.
Louth County Council covers north of the Boyne (Drogheda Town Centre, Termonfeckin, Beaulieu, Mell, Newfoundwell). Meath County Council covers south of the Boyne (Bettystown, Laytown, East Meath). Planning lead times 8-12 weeks both councils. State which council on every contract; section-48 development contributions and planning fees differ.
M1 motorway and 45-min commuter train to Dublin Connolly drive sustained subdivision new-build in Mell, Newfoundwell, Bettystown and outer Termonfeckin. Quote tier-2 developer work (semi-detached, townhouse) at €1,300-€2,200/sqm with HomeBond / Premier Guarantee, NZEB compliance and BCAR Assigned Certifier coordination. Drogheda rates run 25-35% below Dublin metro.
Labour rates are €40 to €96 per hour in the US, £35-90 in the UK, A€60-150 in Australia, R250-700 in South Africa, and C€44-130 in Canada. Most builders prefer to quote fixed-price for jobs over €4,000 and reserve hourly for small repairs.
Builders bid differently on materials, labour mix, and contingency. A 'cheap' quote often skips proper foundations, uses sub-grade fixtures, or leaves the customer paying for variations later. Always compare scope and inclusions, not just totals.
Three for jobs over €8,000. Compare scope, materials, and the payment schedule, not just the headline number. If one is 30% cheaper than the others, it almost always means work is missing from the quote.
For build projects: 30% on signing for materials, 30% on slab/structure, 30% on lock-up (roof and walls complete), 10% on completion. Anyone asking for more than 30% upfront is a risk.
Yes, especially for jobs over €4,000. A contract sets scope, milestones, payment schedule, variation handling, and dispute resolution. Most regions require it by law over a threshold.
Keep going
More builder resources
The full international pricing guide, ready-to-send templates, and the main builders page.
Full builder pricing guide
International rates across 8 countries, plus all common jobs and a 10-question FAQ.
QuoteGenio for Builders
Send branded quotes and invoices from your phone in 2 minutes. Built for builders.
Builder Quote Template
Itemised builder quote with trades, provisional sums, and staged payment schedule.
Testimonials
Trusted by tradespeople in Drogheda
Real builders and other tradies in Drogheda use QuoteGenio to quote and invoice from their phone.
“Before this, I was writing quotes in a notebook and sending photos. Now everything looks professional and clients take me more seriously.”
Deon Kruger
Plumber · Centurion
“Monthly statements for my office clients go out and they pay faster. Chasing invoices used to eat my whole Friday. Now it takes 10 minutes.”
Rebecca Taylor
Cleaning Services · Leeds
“I like how simple it is. No learning curve. I created my first quote in a few minutes and sent it straight away.”
Chris Botha
Carpenter · Bloemfontein
Read more
Guides on pricing and quoting
Long-form posts from the QuoteGenio blog that go deeper on quote writing, pricing strategy, and getting paid.
What a Free Quoting Tool for Tradespeople Should Do
Not every free quoting tool for tradespeople earns its keep. A plain checklist of what to look for, what to avoid, and what tradies actually use.
Convert a Quote to an Invoice in One Tap, No Retyping
The one-tap convert flow eliminates the retyping, the duplicate invoice numbers, and the mismatched line items that cost tradies hours each week.
Voice to Quote: Dictate a Job, Get Priced Line Items
Hold the mic, describe the job in your own words, release. The AI drafts a priced quote. What Voice to Quote is, when to use it, and when not to.

Free forever plan
Start quoting faster. Win more jobs.
Create professional quotes in minutes, send instantly, and stay on top of your work without the admin slowing you down.
Free to start. No credit card required.