QuoteGenio logoQuoteGenio
Free Boiler Installers quote template ready to send via WhatsApp
Free Boiler Installer Quote Template

Free Boiler Installer Quote Template

An itemised boiler installer quote template for combi, system, and conventional boilers. Boiler brand, flue, controls, pipework, and Gas Safe certification itemised.

No credit card required

About the template

What this boiler installer quote template covers and why customers commit

Boiler quotes lose work when 'new boiler from $ X' is the only line. The template below shows the boiler brand and model, the flue, the smart controls, any pipework upgrades, and the Gas Safe certificate that's mandatory on completion.

Removal of the old boiler, the system flush (powerflush vs chemical), and any pipework upgrades to current standards are real cost and and the most common 'extras' that surprise customers on the day. Quoting them upfront builds trust.

What to include

Every boiler installers quote should have these lines

Use it as a checklist when you build your quote from scratch, or pull the QuoteGenio template that already has them.

Boiler brand, model, and kW output
Flue type and length
Smart controls (Hive, Nest, Tado)
System flush (chemical or powerflush)
Pipework upgrades if needed
Removal of old boiler and disposal
Gas Safe certificate on completion
Magnetic filter recommended
Tax line if registered, deposit (typically 30-50%)
Validity 30 days, banking, warranty per manufacturer

Sample

A real boiler installers quote laid out properly

A worked example so you can see what a clean, structured version looks like before you write your own.

Quote sample

Combi boiler swap, Worcester Bosch 30kW with smart controls

Quote #Q-000042

Bill to

Diane Wallace

+1 (555) 408 7126

57 Maple Crescent, Austin

From

Wallace Heating

+1 (555) 220 1184

9 Yard Lane, Cedar Park

Worcester Bosch Greenstar 30Ri (30kW combi)

Qty 1·Rate R27,270R27,270

Horizontal flue (1m, standard pipe)

Qty 1·Rate R3,636R3,636

Nest smart thermostat (3rd gen)

Qty 1·Rate R4,628R4,628

Powerflush of existing system

Qty 1·Rate R7,933R7,933

Magnetic filter (Adey MagnaClean Pro2)

Qty 1·Rate R2,396R2,396

Remove and dispose old boiler

Qty 1·Rate R2,975R2,975

Site labour (Gas Safe engineer, 1 day)

Qty 1·Rate R9,586R9,586

Gas Safe certificate on completion

Qty 1·Rate IncludedR0
SubtotalR58,423
Tax (10%)R5,851
TotalR64,274
Quote valid for 30 days. To accept, reply to this WhatsApp message or tap the link.

Sample data converted from USD to ZAR at indicative rates. QuoteGenio supports 40+ currencies and your branded business details, banking, and logo flow through automatically.

Use this template

Build your own boiler installers quote in 2 minutes

Your business name, logo, and banking details fill in automatically. Send the branded PDF via WhatsApp in one tap.

Avoid these

Common mistakes on boiler installers quotes

The patterns that quietly lose jobs, get queried at payment time, or leave money on the table.

Mistake: Boiler brand not named

Better: Worcester Bosch, Vaillant, Ideal differ in warranty (5-10 year). Always name brand and model.

Mistake: Flue type silent

Better: Horizontal vs vertical, standard vs concentric and different parts. State the flue type and length.

Mistake: System flush not flagged

Better: Powerflush is essential before fitting a new combi. Quote it visibly or risk warranty void.

Mistake: Old boiler removal hidden

Better: Removing and disposing the old unit is real labour. Quote separately.

Mistake: Gas Safe certificate not stated

Better: Required by law. State 'Gas Safe certificate issued on completion' so customer values the legal compliance.

Mistake: No deposit clause

Better: 30-50% on acceptance covers the boiler order. Without it, you fund the supply.

FAQ

Boiler Installers quote template questions

Everything boiler installers ask before they switch to a structured quote.

Boiler brand and model, flue, controls, flush, removal, certificate, tax, deposit, validity, warranty.

Yes. 30-50% on acceptance covers the boiler order. Boilers are typically 2-5 day lead time.

Without a flush, old sludge damages the new boiler and voids the warranty. Manufacturers require it.

Manufacturer warranty (5-10 years per brand). Workmanship warranty 12 months on labour.

Yes. PDF via WhatsApp with the room photo and the kW recommendation accepted fast.

Yes. Nest, Hive, Tado add only $ 200-300 and earn customers 10-20% on heating bills.

Testimonials

Trusted by tradespeople

Real boiler installers and other tradespeople use QuoteGenio to quote and invoice in minutes from their phone.

“Monthly statements for my office clients go out and they pay faster. Chasing invoices used to eat my whole Friday. Now it takes 10 minutes.”

Rebecca Taylor

Cleaning Services · Leeds

“I like how simple it is. No learning curve. I created my first quote in a few minutes and sent it straight away.”

Chris Botha

Carpenter · Bloemfontein

“Wedding packages have so many variables. Sharing a quote on WhatsApp and getting acceptance in the same hour has won me bookings I would have lost.”

Elena Ortiz

Wedding Photographer · Barcelona

Free forever plan

Start quoting faster. Win more jobs.

Create professional quotes in minutes, send instantly, and stay on top of your work without the admin slowing you down.

Free to start. No credit card required.