
Solar installer pricing in Jaipur
What solar installers charge in Jaipur (typically ₹60000-₹120000/hr), the local factors that move the rate, and a sample quote you can use as a starting point.
No credit card required
Jaipur solar installer pricing
What solar installers should charge in Jaipur
Jaipur sits in Rajasthan, the highest-solar-irradiance state in India (5.5 to 6.2 kWh per sqm per day, above Gujarat and Andhra Pradesh). PM Surya Ghar (Muft Bijli Yojana, central government rooftop solar subsidy launched 2024) plus the Rajasthan Solar Policy (aggressive state-level incentives) make Jaipur one of the strongest rooftop-solar markets in India. MNRE (Ministry of New and Renewable Energy) empanelled installers dominate the JVVNL net-metering pipeline.
Hourly rate
₹60000-₹120000
per hour, weekday daytime
Call-out fee
₹42000-₹90000
within standard radius
After-hours
1.5-2x
evening, weekend, holiday
Job pricing
What to charge for common solar installer jobs in Jaipur
Real-world price ranges for the jobs local tradies quote every week. Use the table as a starting point for your own quotes and adjust for parts, access, and your overheads. All figures in INR.
Site survey and quote
What's included
Most reputable installers survey free for systems over 4kW. Detailed shading and structural reports may be charged.
3kW grid-tied system
What's included
Includes 8-10 panels, string inverter, mounting, wiring, and commissioning. Suits small homes or single occupants.
5kW grid-tied system
What's included
Includes 12-15 panels, string or hybrid inverter, mounting, wiring, and commissioning. Most common residential size.
6.6kW grid-tied system (Australia)
What's included
Sized to match the most common rebate threshold. Includes 16-18 panels and inverter. Battery-ready hybrid inverter adds ₹15,000-1,500.
10kW grid-tied system
What's included
Includes 24-28 panels, 8-10kW inverter, mounting, wiring, and commissioning. Best for larger homes or pool households.
Battery add-on (10-13kWh)
What's included
Includes battery, hybrid inverter upgrade if needed, electrical connection, and commissioning. Tesla Powerwall and BYD Premium at the top.
EV charger add-on (Level 2)
What's included
Smart EV charger integrated with solar to use excess power. Includes charger, dedicated circuit, and commissioning.
Annual system check + clean
What's included
Includes panel clean, inverter check, performance review, and report. Required by many warranties to remain valid.
Inverter replacement (mid-system life)
What's included
String inverters typically need replacement at 10-12 years. Includes new inverter, removal of old, and recommissioning.
Jaipur quote factors
What to factor into your Jaipur solar installer quote
Local context that should shape what you quote as a solar installer in Jaipur. Hot semi-arid desert. Extreme hot summers (Mar-Jun, 28-45°C, occasional 48°C+, dust storms), monsoon Jun-Sep (~650mm), pleasant winters (Dec-Feb, 8-25°C, occasional dense fog), very low humidity year-round.
PM Surya Ghar central subsidy
PM Surya Ghar Muft Bijli Yojana (launched 2024) gives Rs 30,000 per kW for first 2kW, Rs 18,000 per kW for next 1kW, max Rs 78,000 subsidy for 3kW system. Subsidy disbursed directly into customer Aadhaar-linked bank account post-installation and JVVNL net-metering activation. State subsidy estimate on every BoQ; print 'subject to MNRE empanelment status and PM Surya Ghar portal application'. Pre-subsidy install Rs 55,000 to Rs 75,000 per kW; net cost after subsidy Rs 30,000 to Rs 50,000 per kW for first 3kW.
Rajasthan Solar Policy state incentive
Rajasthan Solar Policy adds state-level incentive over and above PM Surya Ghar central subsidy. State concessions on stamp duty for rooftop install agreements, accelerated depreciation for commercial install, banking-of-units against future consumption. State both central and Rajasthan-specific subsidy on every BoQ; Rajasthan-resident customers should not be quoted at all-India default subsidy alone.
Standard 3kW residential install pricing
Standard 3kW rooftop on-grid system Rs 1,40,000 to Rs 2,30,000 pre-subsidy supply and install. Includes 6 to 8 monocrystalline panels (Tata, Adani, Waaree, Vikram, Loom Solar at 380W to 540W each), string inverter (Growatt, Sungrow, ABB, SMA, Luminous), MC4 connectors, AC and DC isolators, JVVNL net-meter, mounting structure (galvanised steel) and 25-year panel warranty, 5 to 10 year inverter warranty. Net cost after PM Surya Ghar subsidy Rs 62,000 to Rs 1,52,000.
MNRE empanelment is the trust signal
MNRE (Ministry of New and Renewable Energy) empanelment is mandatory for PM Surya Ghar subsidy disbursement and JVVNL net-metering. State MNRE empanelment number, BIS-marked panel ALMM (Approved List of Models and Manufacturers) status and JVVNL discom-vendor approval on every BoQ. Non-empanelled installers cannot deliver the subsidy promise; the customer becomes the loser.
JVVNL net-metering application
JVVNL (Jaipur Vidyut Vitran Nigam Limited) net-metering application processes within 30 to 60 days post-install. Quote application fee, security deposit, technical-feasibility report, single-line diagram and electrical-inspector visit as separate lines. Tariff: net-export at average pooled purchase cost (APPC) plus state subsidy. Bidirectional net-meter install Rs 8,500 to Rs 18,000.
5 to 10kW commercial and 25+ kW industrial
5 to 10kW commercial rooftop (Civil Lines 302006 villa, boutique-haveli hotel 302002, small office) at Rs 50,000 to Rs 70,000 per kW. 25+ kW industrial rooftop (Sitapura SEZ 302022, Sanganer 303903 factory) at Rs 42,000 to Rs 60,000 per kW with accelerated depreciation benefit. Quote per-kW pricing, Rajasthan banking-of-units explanation and 25-year payback projection on every commercial BoQ.
Sample quote
A real Jaipur solar installer quote you can copy
6.6kW residential rooftop solar, grid-tied, premium tier-1 panels. Replace the line items and rates with your own; the structure stays.
16 x Jinko Tiger Neo N-type 415W panels (25-year product, 30-year power warranty)
Fronius Primo 6.0 string inverter (10-year warranty)
Tile roof mounting system (Schletter or equivalent)
Wiring, isolators, monitoring, DB board integration
Installation labour (2 days, 3-person CEC-licensed team)
Permits, grid connection application, certificate of compliance
System commissioning + customer monitoring app setup
Federal rebate (deducted at point of sale)
FAQ
Jaipur solar installer pricing questions, answered
Common questions about solar installer pricing in Jaipur, with answers framed for tradies pricing their own work.
3kW residential Rs 1,40,000 to Rs 2,30,000 pre-subsidy supply and install (net cost after PM Surya Ghar Rs 62,000 to Rs 1,52,000). 5 to 10kW commercial Rs 50,000 to Rs 70,000 per kW. 25+ kW industrial Rs 42,000 to Rs 60,000 per kW. Hourly Rs 240 to Rs 500 standard, Rs 450 to Rs 850 premium for design and supervision. Add GST (5 percent on solar PV modules and devices under HSN 8541; 18 percent on labour services SAC 9954).
PM Surya Ghar Muft Bijli Yojana (launched 2024) gives Rs 30,000 per kW for first 2kW, Rs 18,000 per kW for next 1kW, max Rs 78,000 subsidy for 3kW system. Subsidy disbursed directly into customer Aadhaar-linked bank account post-installation and JVVNL net-metering activation. State subsidy estimate on every BoQ; print 'subject to MNRE empanelment status and PM Surya Ghar portal application'.
Yes. Rajasthan Solar Policy adds state-level incentive over and above PM Surya Ghar central subsidy: concessions on stamp duty for rooftop install agreements, accelerated depreciation for commercial install, banking-of-units against future consumption. State both central and Rajasthan-specific subsidy on every BoQ; Rajasthan-resident customers should not be quoted at all-India default subsidy alone.
Rajasthan has the highest solar irradiance in India (5.5 to 6.2 kWh per sqm per day, above Gujarat and Andhra Pradesh). A 3kW system generates 4,500 to 5,400 kWh per year in Jaipur vs 3,800 to 4,400 kWh in Mumbai or Bangalore. Payback period 3 to 5 years after PM Surya Ghar subsidy on a 3kW residential install at Rs 7 to Rs 9 per kWh JVVNL tariff.
Mandatory for PM Surya Ghar subsidy disbursement and JVVNL net-metering. State MNRE empanelment number, BIS-marked panel ALMM (Approved List of Models and Manufacturers) status and JVVNL discom-vendor approval on every BoQ. Non-empanelled installers cannot deliver the subsidy promise; print empanelment certificate on every premium quote.
Per kW installed in {YEAR}: ₹36,000 to ₹75,000 in the US, £1,200-2,000 in the UK, A₹27,000-1,800 in Australia, R18,000-35,000 in South Africa, and C₹72,000-3,800 in Canada. Larger systems get cheaper per-kW due to scale; tier-1 panels and premium inverters push toward the top.
Most 3-bed homes need 5-8kW; 4-bed+ homes with pool or EV need 8-12kW. Look at your last 12 months of electricity bills, divide annual kWh by 1,300 (Australia/SA), 950 (UK/Canada), or 1,200 (US average). That gives kW capacity to offset most of your bill.
Depends on your feed-in tariff. Where FIT is high (Australia historically), batteries have 10-12 year payback; export to grid is more valuable. Where blackouts are common (South Africa) or FIT is low (UK), batteries pay back faster and add resilience. Quote both options.
A standard 5-10kW residential install is 1-2 days on the roof for a 3-person team, plus grid connection paperwork (1-6 weeks depending on utility). Larger systems and commercial installs take 3-7 days.
Site visits and verbal quotes for systems over 4kW are usually free. A detailed shading analysis, structural roof report, and load-flow calc for a 20kW+ commercial system takes 4-8 hours and may be charged ₹9,000-1,500. Worth it on large projects.
Keep going
More solar installer resources
The full international pricing guide, ready-to-send templates, and the main solar installers page.
Full solar installer pricing guide
International rates across 8 countries, plus all common jobs and a 10-question FAQ.
QuoteGenio for Solar installers
Send branded quotes and invoices from your phone in 2 minutes. Built for solar installers.
Solar Installer Quote Template
Solar quote with panel and inverter brand, battery kWh, mounting, and COC.
Testimonials
Trusted by tradespeople in Jaipur
Real solar installers and other tradies in Jaipur use QuoteGenio to quote and invoice from their phone.
“My quotes look a lot more professional now. Clients take them seriously and I spend less time formatting documents.”
Megan Daniels
Interior Designer · Birmingham
“Quoting per square metre used to take me forever. I have templates set up now that cover lawn, pavers, and planting separately. Cuts my admin in half.”
Nathan Walsh
Landscaper · Melbourne
“I used to forget to follow up on quotes. Now I can see what has been viewed, approved, or still pending. Makes my workflow much easier.”
Brandon Daniels
Installer · Paris
Read more
Guides on pricing and quoting
Long-form posts from the QuoteGenio blog that go deeper on quote writing, pricing strategy, and getting paid.
What a Free Quoting Tool for Tradespeople Should Do
Not every free quoting tool for tradespeople earns its keep. A plain checklist of what to look for, what to avoid, and what tradies actually use.
Convert a Quote to an Invoice in One Tap, No Retyping
The one-tap convert flow eliminates the retyping, the duplicate invoice numbers, and the mismatched line items that cost tradies hours each week.
Voice to Quote: Dictate a Job, Get Priced Line Items
Hold the mic, describe the job in your own words, release. The AI drafts a priced quote. What Voice to Quote is, when to use it, and when not to.

Free forever plan
Start quoting faster. Win more jobs.
Create professional quotes in minutes, send instantly, and stay on top of your work without the admin slowing you down.
Free to start. No credit card required.
