Quotes and invoices for Solar Installers
For Solar Installers

Create Free Solar Quotes & Invoices

Quote full PV systems on-site, send a clean spec via WhatsApp, and convert to an invoice once commissioning is signed off. Built around panels, inverters, batteries, and mounting.

View pricing

No credit card required

Overview

Solar PV quotes are sized by the customer's usage, not the roof's potential

Solar PV jobs often start the wrong way: the customer says they want 'as much as the roof will fit'. The right quote starts with their consumption profile, not their roof area. Annual kWh use, daytime versus night-time split, any storage requirement, future EV charging plans, and the local feed-in or net metering rules all shape the system size. A quote that ignores the consumption and just sizes by available roof area sells the customer a system that exports power they aren't paid for, or doesn't cover the loads they wanted covered. The sizing is the conversation.

QuoteGenio gives solar installers a quoting shape that builds from the survey. Consumption analysis and proposed sizing as the first line, panels by brand, model, and quantity, inverter by spec, mounting frame appropriate to the roof type, DC cabling, AC connection and isolators, monitoring app, and any battery storage. Grid connection paperwork (DNO approval, MCS certification, where applicable) as its own line. Send the quote via WhatsApp from the survey, take a deposit on the equipment order, and the final invoice ties to a commissioning report that's also the warranty start date.

Who it is for

Who uses QuoteGenio

Built for PV contractors quoting residential rooftops, commercial arrays, and off-grid systems.

Residential Solar InstallersCommercial PV ContractorsOff-Grid SpecialistsHybrid System InstallersGrid-Tie InstallersSolar Water Heating FittersSolar Maintenance TechniciansRenewable Energy Consultants

The problem

The quoting challenges every solar installer hits

Solar quotes have moving parts. Panel counts, string sizing, battery capacity, mounting hardware, and the COC. Leaving anything off costs you.

Quotes drag on for days

By the time you've pulled panel, inverter, and battery prices together, the client has already accepted a competitor's quote. Speed wins solar work.

System sizing errors cost margin

Underspec the inverter and you're back to swap it. Overspec the battery and you've priced yourself out. Clear quote lines force better sizing conversations up front.

Clients can't compare your quote

When your quote says 'solar system' and a competitor lists every panel, inverter, battery, and warranty, you lose on perceived detail, not price.

The fix

QuoteGenio makes solar quoting fast

A structured workflow that gets panels, inverter, battery, mounting, and COC into a clean PDF before you leave the site visit.

Quote full PV systems on-site
Itemise panels, inverter, battery separately
Send branded PDF via WhatsApp instantly
Convert to invoice after commissioning

The payoff

What you get with QuoteGenio

The everyday wins that add up across a year of quoting and invoicing.

Built for solar

Line items for panels, inverters, batteries, mounting, cabling, and COC. The exact structure a PV quote needs, nothing it doesn't.

Works from your phone

Walk the roof, size the array, and send a full quote before you drive off. No laptop, no after-hours typing up.

Full quote in 5 minutes

A reusable template with your standard panel, inverter, and battery options means a full system quote is a handful of taps.

Professional every time

Your logo, your warranty terms, clean formatting. Solar is a big-ticket purchase. Your quote needs to look the part.

Built for your trade

Quoting calibrated to how solar installers actually work

Pick your trade in Settings and the entire quote flow switches to fit. Line item presets, compliance fields, on-the-quote calculators, and per-m² / after-hours pricing all change to match your industry.

Trade-specific line items

Quick add picker pre-fills the common items your trade quotes. Skip the blank rows.

Brand-specific catalogues

Pylontech, Hikvision, Canadian Solar, Sunsynk and others pre-named. Pick the brand, the description writes itself.

Compliance fields built in

IOPSA, ECASA, PIRB, PSIRA, NHBRC, SAQCC. Set once. Every quote prints them under FROM.

Registration expiry alerts

Dashboard notification 60 days before your PSIRA, CoC or any dated registration lapses.

Per-m² / hour / day billing

Unit selector on every line item: m², hr, linear m, days. Stop doing the maths externally.

After-hours and emergency

1.5× and 2× multipliers as a one-tap toggle. Customer sees the breakdown on the quote.

Quote-flow calculators

Solar size, battery backup, cable run cost. Compute on the spot, drop straight onto the quote.

Staged payments

Deposit on acceptance + balance on completion as two separate amounts on the quote PDF.

Scope-of-work checklist

Structured Included / Not included lists. Client acceptance = signing the scope.

Site-survey mode

Log a location per line item: camera positions, fixtures by room, sensors by zone.

Regional rate hints

Pricing ranges per item per currency shown as you quote.

Free on every plan

All of the above included on the free plan. Premium is for capacity, not the trade tooling.

Why QuoteGenio

Why Solar Installers choose QuoteGenio

The tools that matter most when you are quoting on-site, under pressure, and between jobs.

Quote from your phone

Most Solar Installers build and send quotes directly from the job site. No laptop, no office, no delays.

Win more jobs, faster

The first professional quote a client receives usually wins. Respond in minutes, not hours.

Quote to invoice in one click

When the job is accepted, convert to an invoice instantly. No retyping, no double entry.

Pricing guide

Typical Solar Installers job pricing

A rough guide to what solar installers charge for common residential systems. Pricing moves with panel, inverter, and battery import costs, roof complexity, and whether the install is grid-tie or hybrid. Use these as a reference point, not fixed prices.

JobTypical range
Site assessment and shade analysis$ 120 - $ 280
3kW grid-tie system (turnkey)$ 4,800 - $ 7,500
5kW hybrid system with 5kWh battery$ 9,500 - $ 15,500
8kW hybrid with 10kWh battery$ 14,500 - $ 22,500
Off-grid system (12kW + 20kWh battery)$ 22,000 - $ 38,000
Add battery module (5kWh lithium)$ 2,200 - $ 4,500
Annual PV system service$ 180 - $ 380

Pricing shown in USD as a rough benchmark. Rates vary significantly by country, region, currency, and market.

Call-out fees

Site assessments take an hour on the roof plus shade and string sizing work back at the desk. Charge $ 120 to $ 280 and credit it back on a signed install. Giving away unlimited free assessments burns your technical time and trains clients to treat your expertise as free.

Hourly vs fixed pricing

Quote turnkey PV jobs fixed price with a clear panel, inverter, and battery spec. Use hourly ($ 95 to $ 140 per hour) for fault-finding, fault reports, and after-install tweaks. For unknown roof structures, add a provisional sum for non-standard mounting.

See it in action

Example quote breakdown

Here's what a full 5kW hybrid quote looks like. Every component is visible. Panels, inverter, battery, mounting, cabling, and the COC. Solar clients are spending serious money. A clear line-by-line quote does more to close the deal than a lower price.

Try it yourself

Job size

Region

Sample quote

5kW hybrid solar system with 5kWh battery

455W mono PV panels (Canadian Solar)

12 × $ 185$ 2,220

5kW hybrid inverter (Sunsynk / Deye class)

1 × $ 1,650$ 1,650

5.12kWh lithium battery (Pylontech US3000C)

1 × $ 1,850$ 1,850

Mounting rails, clamps, roof hooks

1 × $ 620$ 620

DC/AC cabling, isolators, combiner box, labour

1 × $ 1,850$ 1,850

Certificate of Compliance and commissioning

1 × $ 340$ 340
Subtotal$ 8,530
Tax (10%)$ 853
Total incl. tax$ 9,383

Totals recalculate as you change the controls above. Tax rate inferred from the sample quote.

Items often forgotten

DC isolators, AC combiner box, earth spike, surge protection, roof penetration sealing, the structural letter for non-standard roofs, grid tie application, commissioning day, and the annual service contract. Build these into your template so you stop eating them out of margin.

Peer snapshot

How Solar Installers actually use QuoteGenio

Indicative activity for Solar Installers on the platform. Use it as a benchmark for how often to quote and how fast to respond.

21

Quotes sent per month

59%

Average quote acceptance

3 min

Median time to send quote

$ 9,383

Typical quote value

Figures are indicative platform averages for this trade segment.

Start quoting Solar Installer jobs like this, free

Build your first quote in under 2 minutes. No credit card, no setup fee, no contract.

Avoid these

Common quoting mistakes

Solar quotes are where installers leak the most margin. The same pricing and scoping mistakes show up on every quote we review. Fix these and your close rate and margin will both climb.

Mistake: Not specifying panel and inverter brand

Better: Write 'Canadian Solar 455W mono' and 'Sunsynk 5kW hybrid' on every line. Generic 'solar panel' lines invite the client to price-shop and come back asking why yours costs more than a cheap Chinese knock-off.

Mistake: Forgetting the Certificate of Compliance

Better: The COC is legally required on any electrical install and insurers will refuse claims without one. List it as a separate $ 280 to $ 400 line on every quote. Never absorb it into labour.

Mistake: Skipping grid-tie application fees

Better: Most municipalities charge a grid-tie application plus a meter change. Quote this as a pass-through line with an estimated fee so the client knows it's coming and doesn't blame you when the bill lands.

Mistake: Underquoting roof penetration and waterproofing

Better: Every mount hook is a hole in the roof. Budget proper flashing, sealant, and a one-year leak warranty line. A single failed seal on a tile roof will cost you more than the whole mounting kit.

Mistake: No provisional sum for non-standard mounting

Better: Tile, thatch, IBR sheet, and flat concrete all mount differently. Quote standard trapezoidal as your baseline and add a provisional sum line for anything else, subject to roof inspection before install day.

Mistake: Quoting battery capacity without autonomy context

Better: '5kWh battery' means nothing to a client. State expected backup duration for essential loads: 'covers lights, fridge, Wi-Fi, and TV for approximately 6 hours'. Clients buy backup in hours, not kWh.

Mistake: No annual service line

Better: Panel cleaning, inverter firmware, and battery health checks are real work. Include an optional 'Year 1 service included, Year 2+ service plan $ 220 / visit' on every quote so the recurring revenue starts on day one.

Mistake: No follow-up after sending the quote

Better: Most quotes that don't close, don't close because nobody followed up. Send a polite check-in 48 hours after the quote lands, and a second nudge at day 7. Two of every three accepted quotes get there because someone followed up.

Step by step

How to quote solar installation jobs

Walk the roof before you size anything. Count the usable roof area per pitch, check orientation and tilt, and log shade from chimneys, trees, and neighbouring walls across the day. Inspect the roof covering (tile, IBR, trapezoidal, thatch) because each mounts differently and needs a matching hook or clamp. Photograph the main DB and note breaker sizes, the meter type, and whether there is space for a hybrid inverter and battery indoors. Measure the cable run from the proposed inverter position to the DB in metres, not steps. These observations are what separate a profitable 5kW hybrid quote from one that bleeds margin on roof penetrations and non-standard mounting.

Itemise every component by brand and model. Write the panel line as '455W mono Canadian Solar' with quantity, the inverter as 'Sunsynk or Deye 5kW hybrid', and the battery as 'Pylontech US3000C 5.12kWh'. Break out mounting rails, clamps, and roof hooks, then put DC and AC cabling, isolators, combiner box, and surge protection on their own line. Add a separate Certificate of Compliance line at $ 280 to $ 400 and a grid-tie application line as a pass-through with an estimated municipal fee. For tile, thatch, or flat-concrete roofs include a provisional sum for non-standard mounting. A vague 'solar system' line loses to a competitor who lists every component.

Set a 14 day validity on solar quotes because panel, inverter, and battery import prices swing with the exchange rate. State that mounting and cable lengths are priced on a standard trapezoidal assumption, and that any variation discovered on install day is quoted before work continues. Ask for a 50 to 60 percent deposit against ordered equipment since you are committing to Canadian Solar, Sunsynk, and Pylontech stock on the client's behalf. Pass through the manufacturer warranty on panels (typically 25 years performance), inverter (5 to 10 years), and battery (10 years or 6,000 cycles) and add a 12 month workmanship warranty that starts on commissioning, not delivery.

Send the quote before you climb off the roof. Solar is a considered purchase and clients collect two or three quotes in the same week, so the first properly itemised PDF usually wins even when it is not the cheapest. Build the quote on your phone during the site visit, share it as a WhatsApp link before you pack the ladder, and follow up three days later with a short message asking whether they want you to reserve the Sunsynk stock. Any post-acceptance scope change (added battery module, tile roof discovered, extra circuit on the essential load board) goes out as a separate variation quote with its own number, never absorbed into the original.

FAQ

Common questions from solar installers

Everything you need to know before getting started.

Yes. Add each component as its own line with brand, model, and quantity. Clients want to see exactly what they're paying for on a PV system.

Yes. Share the quote as a link via WhatsApp directly from your phone. The client opens a professional branded PDF instantly, no signup needed.

Yes. Add a Certificate of Compliance line at your standard rate. It's always good practice to show it separately rather than hiding it in labour.

Yes. Every quote has a unique public link. The client opens it on their phone and accepts online. No account needed.

Yes. One click converts the accepted quote to an invoice. All line items carry over automatically.

Yes. The free plan gives you 5 quotes and 2 invoices per month with no credit card required. Upgrade to Premium for unlimited quotes and invoices.

Fixed-price for standard residential rooftops where you can specify panels, inverter, battery, and mounting up front. Cost-plus (or provisional sums) for commercial roofs, heritage buildings, or anywhere the structure is unknown. Always list exactly what's included: panels, inverter, battery, mounting, wiring, COC, commissioning, and grid-tie application. Vague 'turnkey solar system' pricing causes arguments on invoice day every time.

Quote the labour, mounting, inverter, battery, and COC as normal, then add a line noting 'Client-supplied panels: warranty and performance excluded from our scope'. Charge a slightly higher labour rate to account for handling unfamiliar equipment. If the panels are imported directly by the client, get the spec sheet before you commit to an inverter model, because MPPT ranges matter. Never accept responsibility for panel warranty on equipment you didn't source.

Quote the initial battery as its own line, then add an 'Optional future expansion' section showing the cost per additional 5kWh module at today's pricing. Set an expiry date on that optional pricing (6 months is reasonable). This closes the initial deal because the client sees an upgrade path, and it teaches them that battery prices move so the expansion isn't necessarily cheaper next year.

For residential quotes, fold site assessment and string sizing into a single 'Site assessment and system design' line at $ 120 to $ 280. For commercial arrays over 30kW, quote engineering and design as a separate scope with its own deliverable (shade report, string layout, single-line diagram). Commercial clients expect to pay for engineering and residential clients don't, so price the two markets differently.

Still have questions? We would rather answer them now than after you have signed up.

Contact us

Pricing benchmark

What do solar installers charge in 2026?

Hourly rates by region, common job prices, a worked sample quote, and the FAQs customers actually ask. The complete pricing reference for solar installers.

Typical hourly

$2000-$3500/hr

Open pricing guide

Explore more

Related trades in Electrical & Energy

QuoteGenio is built for a whole family of trades. Explore other pages that might fit how you work.

Reviews

Trusted by tradespeople

Real feedback from people who quote for a living.

"The statements feature is brilliant for my monthly retainer clients. Everything looks polished and my clients pay faster."

Aoife O'Sullivan

Landscape Designer · Dublin

"I used to send long email quotes that clients would ignore. Now I send a clean quote link and get responses much quicker."

Emily Carter

Freelance Designer · London

"The templates look incredibly professional. My clients in Italy are always impressed by the branding. Huge time saver."

Sofia Ricci

Interior Designer · Milan

Business owner sending a QuoteGenio quote from a mobile phone

Free forever plan

Start quoting faster. Win more jobs.

Create professional quotes in minutes, send instantly, and stay on top of your work without the admin slowing you down.

Free to start. No credit card required.