Hyderabad solar installer pricing
What solar installers should charge in Hyderabad
Hyderabad solar market is buoyed by Telangana high solar irradiance (5.5 to 6.0 kWh/sqm/day), MNRE PM Surya Ghar Muft Bijli Yojana, and TSSPDCL net metering. MNRE empanelled vendor + BIS-certified components required. Per-kW installed cost Rs 50,000 to Rs 80,000. Banjara Hills, Jubilee Hills, Gachibowli, HITEC City premier driving battery storage growth.
Hourly rate
₹60000-₹120000
per hour, weekday daytime
Call-out fee
₹42000-₹90000
within standard radius
After-hours
1.5-2x
evening, weekend, holiday
Job pricing
What to charge for common solar installer jobs in Hyderabad
Real-world price ranges for the jobs local tradies quote every week. Use the table as a starting point for your own quotes and adjust for parts, access, and your overheads. All figures in INR.
Site survey and quote
What's included
Most reputable installers survey free for systems over 4kW. Detailed shading and structural reports may be charged.
3kW grid-tied system
What's included
Includes 8-10 panels, string inverter, mounting, wiring, and commissioning. Suits small homes or single occupants.
5kW grid-tied system
What's included
Includes 12-15 panels, string or hybrid inverter, mounting, wiring, and commissioning. Most common residential size.
6.6kW grid-tied system (Australia)
What's included
Sized to match the most common rebate threshold. Includes 16-18 panels and inverter. Battery-ready hybrid inverter adds ₹15,000-1,500.
10kW grid-tied system
What's included
Includes 24-28 panels, 8-10kW inverter, mounting, wiring, and commissioning. Best for larger homes or pool households.
Battery add-on (10-13kWh)
What's included
Includes battery, hybrid inverter upgrade if needed, electrical connection, and commissioning. Tesla Powerwall and BYD Premium at the top.
EV charger add-on (Level 2)
What's included
Smart EV charger integrated with solar to use excess power. Includes charger, dedicated circuit, and commissioning.
Annual system check + clean
What's included
Includes panel clean, inverter check, performance review, and report. Required by many warranties to remain valid.
Inverter replacement (mid-system life)
What's included
String inverters typically need replacement at 10-12 years. Includes new inverter, removal of old, and recommissioning.
Hyderabad quote factors
What to factor into your Hyderabad solar installer quote
Local context that should shape what you quote as a solar installer in Hyderabad. Tropical savanna 542m altitude — milder than Chennai/Mumbai. Hot summers (Mar-May, 25-40°C), pleasant winters (Dec-Feb, 14-28°C), monsoon Jun-Sep + Oct (~800mm). Less AC dependence than coastal cities.
MNRE empanelled vendor + BIS-certified
PM Surya Ghar subsidy requires installation by MNRE empanelled vendor. BIS certification on panels (IS 14286), inverter (IS 16221), cables (IS 694). Print MNRE empanelment number and BIS certification on every quote. TSSPDCL DISCOM net-metering approval mandatory.
Per-kW installed cost + PM Surya Ghar subsidy
Hyderabad residential and small commercial solar runs Rs 50,000 to Rs 80,000 per kW installed. 3kW residential system typically Rs 1,50,000 to Rs 2,40,000 before PM Surya Ghar Muft Bijli Yojana subsidy of Rs 78,000 (for 3kW). State both gross and net cost (after subsidy) on every quote. GST 5 percent on solar (concessional) for residential rooftop.
Telangana high solar irradiance + PM Surya Ghar
Telangana high solar irradiance (5.5 to 6.0 kWh/sqm/day, among India's best) drives strong payback (3 to 5 years residential). PM Surya Ghar Muft Bijli Yojana (Rs 30,000 / kW up to 2kW, Rs 18,000 / kW for 2-3kW, Rs 78,000 cap for 3kW) plus TSSPDCL net metering. Quote both as lines on net cost; conversion rate doubles when subsidies are visible.
TSSPDCL net metering + interconnection
Grid-tied solar requires TSSPDCL (Telangana State Southern Power Distribution Company Limited) interconnection approval and net-metering setup. Lead times 6 to 12 weeks. Quote TSSPDCL coordination (Rs 15,000 to Rs 80,000) as separate line including DISCOM application, net-metering installation, commissioning.
Cyberabad IT campus + pharma rooftop commercial
HITEC City / Madhapur (500081), Kondapur (500084), Gachibowli (500032) IT campuses (Microsoft, Google, Apple India, Amazon, Facebook, Goldman Sachs, Salesforce, ServiceNow) and pharma campuses (Dr Reddy's, Aurobindo, Genome Valley) drive commercial rooftop solar (50 kW to 5 MW). Quote OPEX (PPA) and CAPEX models separately. Telangana high-irradiance pays back fast.
Battery storage growing + Tata Power, Adani, Vikram
Banjara Hills, Jubilee Hills, Gachibowli, HITEC City driving battery storage adoption (LFP chemistry safer for Indian heat). Quote battery storage (Tata Power Solar, Adani Solar, Vikram Solar, Waaree, Luminous, Exide) at Rs 80,000 to Rs 2,40,000 per kWh installed. Useful for IT campus backup.
Sample quote
A real Hyderabad solar installer quote you can copy
6.6kW residential rooftop solar, grid-tied, premium tier-1 panels. Replace the line items and rates with your own; the structure stays.
16 x Jinko Tiger Neo N-type 415W panels (25-year product, 30-year power warranty)
Fronius Primo 6.0 string inverter (10-year warranty)
Tile roof mounting system (Schletter or equivalent)
Wiring, isolators, monitoring, DB board integration
Installation labour (2 days, 3-person CEC-licensed team)
Permits, grid connection application, certificate of compliance
System commissioning + customer monitoring app setup
Federal rebate (deducted at point of sale)
FAQ
Hyderabad solar installer pricing questions, answered
Common questions about solar installer pricing in Hyderabad, with answers framed for tradies pricing their own work.
Rs 50,000 to Rs 80,000 per kW installed (Rs 50 to Rs 80 per watt) for residential and small commercial. Premium tier (battery storage, smart monitoring, branded MNRE-empanelled panels) Rs 70,000 to Rs 1,00,000 per kW. Banjara Hills / Jubilee Hills premium of 15 to 25 percent. State MNRE empanelment, BIS certification, and 'GST 5 percent' on every quote.
Yes, for PM Surya Ghar subsidy work. MNRE empanelled vendor required for subsidy claims. BIS certification on panels (IS 14286), inverter (IS 16221), cables (IS 694). Print MNRE empanelment number and BIS certification on every quote. TSSPDCL DISCOM net-metering approval mandatory.
PM Surya Ghar Muft Bijli Yojana central subsidy: Rs 30,000 per kW up to 2 kW, Rs 18,000 per kW for 2-3 kW (Rs 78,000 cap for 3kW), plus TSSPDCL net metering. Quote subsidy as visible line on net cost; conversion rate doubles when subsidies are visible. GST 5 percent (concessional) on residential rooftop solar.
Yes, growth market. HITEC City / Madhapur (500081), Kondapur (500084), Gachibowli (500032) IT campuses (Microsoft, Google, Apple India, Amazon, Facebook, Goldman Sachs, Salesforce, ServiceNow) and pharma campuses (Dr Reddy's, Aurobindo, Genome Valley) drive commercial rooftop solar (50 kW to 5 MW). Quote OPEX (PPA) and CAPEX models separately. Telangana high-irradiance pays back fast.
Grid-tied solar requires TSSPDCL (Telangana State Southern Power Distribution Company Limited) interconnection approval and net-metering setup. Lead times 6 to 12 weeks. Quote TSSPDCL coordination (Rs 15,000 to Rs 80,000) as separate line including DISCOM application, net-metering installation, commissioning. State lead time on the contract.
Per kW installed in {YEAR}: ₹36,000 to ₹75,000 in the US, £1,200-2,000 in the UK, A₹27,000-1,800 in Australia, R18,000-35,000 in South Africa, and C₹72,000-3,800 in Canada. Larger systems get cheaper per-kW due to scale; tier-1 panels and premium inverters push toward the top.
Most 3-bed homes need 5-8kW; 4-bed+ homes with pool or EV need 8-12kW. Look at your last 12 months of electricity bills, divide annual kWh by 1,300 (Australia/SA), 950 (UK/Canada), or 1,200 (US average). That gives kW capacity to offset most of your bill.
Depends on your feed-in tariff. Where FIT is high (Australia historically), batteries have 10-12 year payback; export to grid is more valuable. Where blackouts are common (South Africa) or FIT is low (UK), batteries pay back faster and add resilience. Quote both options.
A standard 5-10kW residential install is 1-2 days on the roof for a 3-person team, plus grid connection paperwork (1-6 weeks depending on utility). Larger systems and commercial installs take 3-7 days.
Site visits and verbal quotes for systems over 4kW are usually free. A detailed shading analysis, structural roof report, and load-flow calc for a 20kW+ commercial system takes 4-8 hours and may be charged ₹9,000-1,500. Worth it on large projects.
Keep going
More solar installer resources
The full international pricing guide, ready-to-send templates, and the main solar installers page.
Full solar installer pricing guide
International rates across 8 countries, plus all common jobs and a 10-question FAQ.
QuoteGenio for Solar installers
Send branded quotes and invoices from your phone in 2 minutes. Built for solar installers.
Solar Installer Quote Template
Solar quote with panel and inverter brand, battery kWh, mounting, and COC.
Testimonials
Trusted by tradespeople in Hyderabad
Real solar installers and other tradies in Hyderabad use QuoteGenio to quote and invoice from their phone.
“I used to quote at night after jobs. Now I send quotes while I am still on-site and get faster approvals. Makes a big difference.”
Mark Jacobs
Electrician · Perth
“Linear metre pricing with different gate options was messy before. Now my template has everything pre-loaded and I send fence quotes in under three minutes.”
Tyler Jensen
Fence Installer · Houston
“It makes my proposals look more structured and professional without spending hours formatting documents. Saves me a lot of time.”
Daniel Ross
Marketing Consultant · Perth
Read more
Guides on pricing and quoting
Long-form posts from the QuoteGenio blog that go deeper on quote writing, pricing strategy, and getting paid.
What a Free Quoting Tool for Tradespeople Should Do
Not every free quoting tool for tradespeople earns its keep. A plain checklist of what to look for, what to avoid, and what tradies actually use.
Convert a Quote to an Invoice in One Tap, No Retyping
The one-tap convert flow eliminates the retyping, the duplicate invoice numbers, and the mismatched line items that cost tradies hours each week.
Voice to Quote: Dictate a Job, Get Priced Line Items
Hold the mic, describe the job in your own words, release. The AI drafts a priced quote. What Voice to Quote is, when to use it, and when not to.

Free forever plan
Start quoting faster. Win more jobs.
Create professional quotes in minutes, send instantly, and stay on top of your work without the admin slowing you down.
Free to start. No credit card required.