
About the template
What this plasterer quote template covers and why it wins more work
Plastering quotes lose work when 'skim coat from $ X' is the only line. The template below shows area in sqm, number of coats (one-coat vs two-coat), any board supplied, scaffold hire if needed, and bag count of plaster.
Patch vs full re-skim is a real cost difference. Customers want clarity and the template forces the conversation upfront, not on the day.
What to include
Every plasterers quote should have these lines
Use it as a checklist when you build your quote from scratch, or pull the QuoteGenio template that already has them.
Sample
A real plasterers quote laid out properly
A worked example so you can see what a clean, structured version looks like before you write your own.
Quote sample
Full re-plaster: lounge ceiling and walls, 40 sqm
Bill to
Lewis Wallace
+1 (555) 408 7126
12 Maple Crescent, Austin
From
Wallace Plastering
+1 (555) 220 1184
9 Yard Lane, Cedar Park
Plaster removal and prep (40 sqm)
12.5mm board supplied and fixed (40 sqm)
Two-coat skim to ready-for-paint (40 sqm)
Multi-finish plaster supplied (15 bags)
Disposal of old plaster
Sample data converted from USD to ZAR at indicative rates. QuoteGenio supports 40+ currencies and your branded business details, banking, and logo flow through automatically.
Use this template
Build your own plasterers quote in 2 minutes
Your business name, logo, and banking details fill in automatically. Send the branded PDF via WhatsApp in one tap.
Avoid these
Common mistakes on plasterers quotes
The patterns that quietly lose jobs, get queried at payment time, or leave money on the table.
Mistake: Quoting per sqm only
Better: Itemise removal, board, plaster, skim coats. Customer sees the full build-up.
Mistake: Coat count not stated
Better: One-coat skim is fine for a refresh, two-coat is required for fresh board. State which.
Mistake: Plaster bags hidden
Better: State 'Multi-finish 15 bags supplied'. Customer reconciles against delivery slip.
Mistake: Removal not itemised
Better: Stripping old plaster is real labour and disposal. Quote separately so the customer values it.
Mistake: Scaffold silent
Better: Anything above 4m needs scaffold. Quote separately so customers see the access cost.
Mistake: Drying time not communicated
Better: Fresh plaster needs 14-21 days drying before paint. State on quote to avoid premature painting.
FAQ
Plasterers quote template questions
Everything plasterers ask before they switch to a structured quote.
Area, job type, coats, board supplied, bag count, scaffold, removal, tax, deposit, validity, and warranty.
Yes. 30% on acceptance covers plaster bag and board supply order.
14-21 days drying. Mist coat first (watered-down emulsion), then standard paint.
12-month workmanship on cracking. Manufacturer warranty on plaster covers the material.
Yes. PDF via WhatsApp gets accepted within a week typically.
Per patch with size band (small patch <0.5 sqm, medium <1.5 sqm, large >1.5 sqm). Minimum job value applies.
Related templates
Other construction & building templates
Same hub, different trade and same itemised format, ready to send via WhatsApp.
Builder Quote Template
Itemised builder quote with trades, provisional sums, and staged payment schedule.
Builder Invoice Template
Staged builder invoice with variations, retention, and cumulative paid figures.
Painter Quote Template
Painter quote with prep, coats, trim, paint brand, and snag walk-through.
Painter Invoice Template
Painter invoice with paint brand, coats, trim, and snag completion date.
Carpenter Quote Template
Carpenter quote with board spec, hinge brand, drawer count, and snag visit.
Carpenter Invoice Template
Carpenter invoice with stage payments, hardware spec, and snag visit confirmation.
Testimonials
Trusted by tradespeople
Real plasterers and other tradespeople use QuoteGenio to quote and invoice in minutes from their phone.
“The statements feature is brilliant for my monthly retainer clients. Everything looks polished and my clients pay faster.”
Aoife O'Sullivan
Landscape Designer · Dublin
“I used to send long email quotes that clients would ignore. Now I send a clean quote link and get responses much quicker.”
Emily Carter
Freelance Designer · London
“The templates look incredibly professional. My clients in Italy are always impressed by the branding. Huge time saver.”
Sofia Ricci
Interior Designer · Milan
From the blog
Guides on writing better plasterers quotes
Hand-picked posts that go deeper on the topics covered in this template.
How to Write a Quote for a Building or Renovation Job
Building and renovation quotes are more complex than most. Here's how to structure them so clients understand what they're getting, and disputes are avoided.
How to Charge Deposits on Quotes (Complete Guide)
Deposits protect your cash flow, reduce the risk of ghosting clients, and signal that you run a real business. Here is exactly when to charge one, how much to ask for, and how to write it into your quote so clients say yes.
What to Include in Every Quote (Complete Checklist)
A field tested checklist of every line item, term, and detail that should be on your quotes so you stop losing jobs and arguments.
Free forever plan
Start quoting faster. Win more jobs.
Create professional quotes in minutes, send instantly, and stay on top of your work without the admin slowing you down.
Free to start. No credit card required.

