QuoteGenio logoQuoteGenio
Free Decking Installers quote template ready to send via WhatsApp
Free Decking Installer Quote Template

Free Decking Installer Quote Template

An itemised decking installer quote template for timber, composite, and hardwood decks. Sub-frame, board spec, fasteners, balustrade, and stain itemised so customers compare on substance.

No credit card required

About the template

What this decking installer quote template covers and why it wins more decks

Decking quotes lose work when 'supply and lay per sqm' is the only line. The template below shows the sub-frame build, the board material (composite, hardwood, treated pine), the fastener type (hidden vs face-fixed), and any balustrade or stair work.

Composite and hardwood differ massively in price and warranty. Naming the brand and the warranty period on the quote builds trust and prevents 'cheap composite' substitutions.

What to include

Every decking installers quote should have these lines

Use it as a checklist when you build your quote from scratch, or pull the QuoteGenio template that already has them.

Deck area in square metres
Sub-frame material and spacing
Board material (composite brand, hardwood, treated pine)
Fastener type (hidden clips vs face-fixed)
Balustrade spec if applicable
Stairs and steps if applicable
Stain or oil if treated pine
Removal of existing deck
Disposal of timber off-cuts
Tax line if registered, deposit (typically 30-50%), warranty

Sample

A real decking installers quote laid out properly

A worked example so you can see what a clean, structured version looks like before you write your own.

Quote sample

30 sqm composite deck with balustrade

Quote #Q-000042

Bill to

Hannah Vorster

+1 (555) 408 7126

92 Highland Drive, Austin

From

Vorster Decking Co

+1 (555) 220 1184

9 Yard Lane, Cedar Park

Treated pine sub-frame (joists 400mm centres, 30 sqm)

Qty 30·Rate R628 / sqmR18,841

Composite decking boards (Trex Enhance, charcoal)

Qty 30·Rate R2,396 / sqmR71,892

Hidden clip fasteners (stainless)

Qty 30·Rate R297 / sqmR8,925

Aluminium balustrade with glass infill (8m run)

Qty 8·Rate R4,710 / mR37,682

Stairs and steps (3 risers)

Qty 1·Rate R9,586R9,586

Site labour (2-person team, 4 days)

Qty 4·Rate R15,205 / dayR60,819
SubtotalR207,744
Tax (10%)R20,774
TotalR228,519
Quote valid for 30 days. To accept, reply to this WhatsApp message or tap the link.

Sample data converted from USD to ZAR at indicative rates. QuoteGenio supports 40+ currencies and your branded business details, banking, and logo flow through automatically.

Use this template

Build your own decking installers quote in 2 minutes

Your business name, logo, and banking details fill in automatically. Send the branded PDF via WhatsApp in one tap.

Avoid these

Common mistakes on decking installers quotes

The patterns that quietly lose jobs, get queried at payment time, or leave money on the table.

Mistake: Sub-frame bundled into board rate

Better: Sub-frame is real timber and labour. Quote separately so customer sees the build quality.

Mistake: Board brand not named

Better: Trex, Eva-Last, generic composite all differ in warranty (10-25 years). Always name brand and warranty.

Mistake: Fastener type silent

Better: Hidden clips look better but cost 30-50% more than face-fixed. State the choice.

Mistake: Balustrade bundled

Better: Aluminium and glass balustrade is a separate trade-cost. Quote per metre with infill type.

Mistake: Stairs bundled into deck rate

Better: Each stair riser is real labour. Quote per stair set so the price reflects the build.

Mistake: No deposit clause

Better: 30-50% on acceptance covers timber and composite supply. Without it, you fund 60% of materials.

FAQ

Decking Installers quote template questions

Everything decking installers ask before they switch to a structured quote.

Area, sub-frame, board material, fasteners, balustrade, stairs, stain, removal, tax, deposit, validity, banking, and warranty.

Yes. 30-50% on acceptance covers timber and composite supply. Composite is typically made-to-order.

30 days. Timber and composite prices move with imports. Longer validity means you absorb increases.

5-year workmanship. Composite brands carry 10-25 year manufacturer warranty on the board itself.

Yes. PDF via WhatsApp with the layout sketch attached. Most decks are decided within 2 weeks.

Yes. Offer the customer both options with clear price gaps so they choose the right material for their budget.

Testimonials

Trusted by tradespeople

Real decking installers and other tradespeople use QuoteGenio to quote and invoice in minutes from their phone.

“I used to quote at night after jobs. Now I send quotes while I am still on-site and get faster approvals. Makes a big difference.”

Mark Jacobs

Electrician · Perth

“Linear metre pricing with different gate options was messy before. Now my template has everything pre-loaded and I send fence quotes in under three minutes.”

Tyler Jensen

Fence Installer · Houston

“It makes my proposals look more structured and professional without spending hours formatting documents. Saves me a lot of time.”

Daniel Ross

Marketing Consultant · Perth

Tradesperson sending a QuoteGenio quote from a mobile phone

Free forever plan

Start quoting faster. Win more jobs.

Create professional quotes in minutes, send instantly, and stay on top of your work without the admin slowing you down.

Free to start. No credit card required.