Solar installer pricing in Burlington
What solar installers charge in Burlington (typically C$2400-C$3800/hr), the local factors that move the rate, and a sample quote you can use as a starting point.
No credit card required
Burlington solar installer pricing
What solar installers should charge in Burlington
Burlington solar market is mid-tier Ontario (similar irradiance to Toronto). ESA Net Metering through Alectra Utilities is the primary connection path. Canada Greener Homes Grant (up to $5,000) + Canada Greener Homes Loan (interest-free up to $40,000) drive residential demand. Per-watt installed cost runs CAD $2.50-$3.50 before 30% federal investment tax credit; 8kW residential install $20,000-$28,000 before ITC. Pre-WWI Aldershot brick roofs often need structural sign-off for snow + panel weight loading. Lake Ontario lake-effect snow loading and polar-vortex events affect array sizing. HST 13% applies.
Hourly rate
C$2400-C$3800
per hour, weekday daytime
Call-out fee
C$1680-C$3600
within standard radius
After-hours
1.5-2x
evening, weekend, holiday
Job pricing
What to charge for common solar installer jobs in Burlington
Real-world price ranges for the jobs local tradies quote every week. Use the table as a starting point for your own quotes and adjust for parts, access, and your overheads. All figures in CAD.
Site survey and quote
What's included
Most reputable installers survey free for systems over 4kW. Detailed shading and structural reports may be charged.
3kW grid-tied system
What's included
Includes 8-10 panels, string inverter, mounting, wiring, and commissioning. Suits small homes or single occupants.
5kW grid-tied system
What's included
Includes 12-15 panels, string or hybrid inverter, mounting, wiring, and commissioning. Most common residential size.
6.6kW grid-tied system (Australia)
What's included
Sized to match the most common rebate threshold. Includes 16-18 panels and inverter. Battery-ready hybrid inverter adds $600-1,500.
10kW grid-tied system
What's included
Includes 24-28 panels, 8-10kW inverter, mounting, wiring, and commissioning. Best for larger homes or pool households.
Battery add-on (10-13kWh)
What's included
Includes battery, hybrid inverter upgrade if needed, electrical connection, and commissioning. Tesla Powerwall and BYD Premium at the top.
EV charger add-on (Level 2)
What's included
Smart EV charger integrated with solar to use excess power. Includes charger, dedicated circuit, and commissioning.
Annual system check + clean
What's included
Includes panel clean, inverter check, performance review, and report. Required by many warranties to remain valid.
Inverter replacement (mid-system life)
What's included
String inverters typically need replacement at 10-12 years. Includes new inverter, removal of old, and recommissioning.
Burlington quote factors
What to factor into your Burlington solar installer quote
Local context that should shape what you quote as a solar installer in Burlington. Humid continental Toronto-similar + Lake Ontario lake-effect. Cold snowy winters (-10°C to -25°C polar vortex, ~140cm snow), hot humid summers (28-32°C), moderate rainfall ~865mm/year. Freeze-thaw 50-70/year.
ESA Net Metering + Alectra Utilities
Grid-tied solar in Burlington requires ESA Permit + Net Metering Agreement with Alectra Utilities (Burlington's local distribution company). Quote ESA Permit ($180-$540) and Alectra Net Metering coordination ($360-$1,800) as separate lines. Lead times 6-14 weeks; state lead time on the contract.
Per-watt installed cost
Burlington residential and small commercial solar runs CAD $3-$4 per watt installed ($3,000-$4,200 per kW) before federal incentives. 8kW residential install runs CAD $24,000-$33,600 before 30% ITC, CAD $28,800-$38,400 premium (with battery storage, smart monitoring, premium-tier panels). State per-watt rate, panel brand, inverter brand, and Alectra Net Metering coordination on every quote.
Canada Greener Homes Grant + Loan
Canada Greener Homes Grant (up to $6,000 for solar + envelope) and Canada Greener Homes Loan (interest-free up to $48,000) drive residential demand. Federal incentives apply nationally; quote rebates as a line on net cost. Conversion rate doubles when 25-year payback math + rebates are visible. Save on Energy SREC-equivalent has been wound down; Alectra Utilities Net Metering is the primary mechanism.
Snow load + pre-WWI Aldershot structural
Burlington Lake Ontario lake-effect snow + panel weight requires structural engineer's letter for most installs, especially pre-WWI Aldershot (L7T, founded 1873), Indian Point (L7L), Roseland (L7N), and LaSalle Park (L7T). Quote structural engineer ($1,800-$6,600) as separate line on every install. Pre-WWI housing often needs rafter reinforcement ($4,200-$18,000) before panel install; pre-quote on every pre-WWI Aldershot job.
Battery storage growing
Burlington battery storage growing fast post-Greener Homes Loan eligibility. Quote battery storage (Tesla Powerwall 3, Enphase IQ Battery, FranklinWH aGate, LG Resu Prime) at CAD $10,800-$27,600 per battery installed. Polar-vortex grid-failure events drive demand; ice-storm grid outages on Roseland and Indian Point lakefront exposures are common. Greener Homes Loan covers battery storage.
Roseland + Aldershot + Indian Point premium tier
Roseland (L7N), Aldershot Heritage Bay (L7T), Tyandaga (L7P), Indian Point (L7L), LaSalle Park (L7T), Headon Forest (L7L), and Millcroft (L7M) clients expect premium brands (SunPower Maxeon, REC Alpha Pure, Panasonic EVERVOLT, Q Cells Q.PEAK DUO ML-G10+) with Enphase IQ8 or SolarEdge inverters. Quote premium tier at CAD $4-$5 per watt.
Sample quote
A real Burlington solar installer quote you can copy
6.6kW residential rooftop solar, grid-tied, premium tier-1 panels. Replace the line items and rates with your own; the structure stays.
16 x Jinko Tiger Neo N-type 415W panels (25-year product, 30-year power warranty)
Fronius Primo 6.0 string inverter (10-year warranty)
Tile roof mounting system (Schletter or equivalent)
Wiring, isolators, monitoring, DB board integration
Installation labour (2 days, 3-person CEC-licensed team)
Permits, grid connection application, certificate of compliance
System commissioning + customer monitoring app setup
Federal rebate (deducted at point of sale)
FAQ
Burlington solar installer pricing questions, answered
Common questions about solar installer pricing in Burlington, with answers framed for tradies pricing their own work.
CAD $3,000-$4,200 per kW installed (CAD $3-$4 per watt) for residential and small commercial before federal incentives. Premium tier (battery storage, smart monitoring, branded panels) CAD $3,840-$5,040 per kW (CAD $4-$5/W). Roseland, Aldershot Heritage Bay, Indian Point, Tyandaga, Headon Forest, and Millcroft premium of 10-18%. State whether grid-tied or hybrid (battery), inverter brand, panel brand, and Alectra Net Metering coordination on every quote. HST 13% on top.
Canada Greener Homes Grant (up to $6,000 for solar + envelope) and Canada Greener Homes Loan (interest-free up to $48,000). Federal incentives apply nationally; quote rebates as a line on net cost. Conversion rate doubles when 25-year payback math + rebates are visible. Save on Energy SREC-equivalent has been wound down; Alectra Utilities Net Metering is the primary mechanism.
Yes, on every Burlington install. Lake Ontario lake-effect snow + panel weight requires structural engineer's letter, especially pre-WWI Aldershot (L7T, founded 1873), Indian Point (L7L), Roseland (L7N), and LaSalle Park (L7T). Quote $1,800-$6,600 as separate line. Pre-WWI housing often needs rafter reinforcement ($4,200-$18,000) before panel install; pre-quote on every pre-WWI Aldershot job.
Grid-tied solar in Burlington requires ESA Permit + Net Metering Agreement with Alectra Utilities. Quote ESA Permit ($180-$540) and Alectra Net Metering coordination ($360-$1,800) as separate lines. Lead times 6-14 weeks for residential, 8-16 weeks for commercial. State lead time on the contract so clients don't blame the installer for utility delays.
Yes, growing fast. Quote battery storage (Tesla Powerwall 3, Enphase IQ Battery, FranklinWH aGate, LG Resu Prime) at CAD $10,800-$27,600 per battery installed. Polar-vortex grid-failure events drive demand; ice-storm grid outages on Roseland (L7N) and Indian Point (L7L) lakefront exposures are common. Greener Homes Loan covers battery storage.
Per kW installed in {YEAR}: $1,440 to $3,000 in the US, £1,200-2,000 in the UK, A$1,080-1,800 in Australia, R18,000-35,000 in South Africa, and C$2,880-3,800 in Canada. Larger systems get cheaper per-kW due to scale; tier-1 panels and premium inverters push toward the top.
Most 3-bed homes need 5-8kW; 4-bed+ homes with pool or EV need 8-12kW. Look at your last 12 months of electricity bills, divide annual kWh by 1,300 (Australia/SA), 950 (UK/Canada), or 1,200 (US average). That gives kW capacity to offset most of your bill.
Depends on your feed-in tariff. Where FIT is high (Australia historically), batteries have 10-12 year payback; export to grid is more valuable. Where blackouts are common (South Africa) or FIT is low (UK), batteries pay back faster and add resilience. Quote both options.
A standard 5-10kW residential install is 1-2 days on the roof for a 3-person team, plus grid connection paperwork (1-6 weeks depending on utility). Larger systems and commercial installs take 3-7 days.
Site visits and verbal quotes for systems over 4kW are usually free. A detailed shading analysis, structural roof report, and load-flow calc for a 20kW+ commercial system takes 4-8 hours and may be charged $360-1,500. Worth it on large projects.
Keep going
More solar installer resources
The full international pricing guide, ready-to-send templates, and the main solar installers page.
Full solar installer pricing guide
International rates across 8 countries, plus all common jobs and a 10-question FAQ.
QuoteGenio for Solar installers
Send branded quotes and invoices from your phone in 2 minutes. Built for solar installers.
Solar Installer Quote Template
Solar quote with panel and inverter brand, battery kWh, mounting, and COC.
Testimonials
Trusted by tradespeople in Burlington
Real solar installers and other tradies in Burlington use QuoteGenio to quote and invoice from their phone.
“Switched from a clunky desktop app. QuoteGenio is faster, simpler, and my crews actually use it. Payments tracking is a huge plus.”
Michael O'Brien
General Contractor · Denver, CO
“Saves me about 3 hours every week. I would still be sending WhatsApp images of handwritten quotes if I had not found QuoteGenio.”
James van der Merwe
Plumber · Johannesburg
“The biggest win for me is speed. I can quote while I am still with the client and not worry about doing it later.”
Jason Naicker
Electrician · New Delhi
Read more
Guides on pricing and quoting
Long-form posts from the QuoteGenio blog that go deeper on quote writing, pricing strategy, and getting paid.
What a Free Quoting Tool for Tradespeople Should Do
Not every free quoting tool for tradespeople earns its keep. A plain checklist of what to look for, what to avoid, and what tradies actually use.
Convert a Quote to an Invoice in One Tap, No Retyping
The one-tap convert flow eliminates the retyping, the duplicate invoice numbers, and the mismatched line items that cost tradies hours each week.
Voice to Quote: Dictate a Job, Get Priced Line Items
Hold the mic, describe the job in your own words, release. The AI drafts a priced quote. What Voice to Quote is, when to use it, and when not to.

Free forever plan
Start quoting faster. Win more jobs.
Create professional quotes in minutes, send instantly, and stay on top of your work without the admin slowing you down.
Free to start. No credit card required.