
EV charger installer pricing in Melbourne
What ev charger installers charge in Melbourne (typically $100-$200/hr), the local factors that move the rate, and a sample quote you can use as a starting point.
No credit card required
Melbourne EV charger installer pricing
What ev charger installers should charge in Melbourne
Melbourne EV adoption is growing across premium suburbs (Toorak 3142, Brighton 3186, Hawthorn 3122, South Yarra 3141), outer-suburb new builds (Cranbourne, Pakenham, Werribee, Melton, Craigieburn), and OC-controlled apartment carparks. ESV electrical licence required for any EV charger install. AS/NZS 3000 (Wiring Rules) and AS/NZS 4777 (grid-connect) standards. Solar Victoria EV charger rebate A$1,000 when bundled with solar PV install drives bundled-sale demand. Most pre-2000 Melbourne homes need switchboard upgrade alongside charger install.
Hourly rate
$100-$200
per hour, weekday daytime
Call-out fee
$70-$150
within standard radius
After-hours
1.5-2x
evening, weekend, holiday
Job pricing
What to charge for common EV charger installer jobs in Melbourne
Real-world price ranges for the jobs local tradies quote every week. Use the table as a starting point for your own quotes and adjust for parts, access, and your overheads. All figures in AUD.
Site assessment and quote
What's included
Most installers visit free for paid jobs. Detailed load-flow analysis (for 60A+ chargers) may be charged.
Level 1 install (10-15A outlet)
What's included
Includes outdoor-rated outlet, weatherproof enclosure, and 1-2 hour labour. Slowest charge speed but cheapest.
Level 2 install (32A wall-mount)
What's included
Includes charger, dedicated 40A circuit, isolator, cable run, CoC, and 3-5 hour labour. Most common residential install.
Level 2 install (50A wall-mount)
What's included
Larger 11kW unit for faster charging. Includes dedicated 60A circuit, 6mm conductor cable, isolator, CoC, and 4-6 hour labour.
Tesla Wall Connector install
What's included
Tesla-branded charger (customer-supplied or installer-supplied), dedicated circuit, commissioning, and 3-5 hour labour.
Smart charger with load management
What's included
Higher-end charger with dynamic load balancing (Zappi, Wallbox Pulsar Plus, Easee). Manages home load to avoid blowing main fuse.
Dual-charger garage install
What's included
Two Level 2 chargers, single dedicated circuit with load management. Suits 2-EV households.
Utility upgrade (mains supply)
What's included
Needed if main supply is too small for the new load. Includes utility fees, new main breaker, and meter upgrade.
Annual safety check
What's included
Inspection, electrical test, firmware update, customer report. Required by some rebate programs.
Melbourne quote factors
What to factor into your Melbourne EV charger installer quote
Local context that should shape what you quote as a EV charger installer in Melbourne. Temperate oceanic. Four-seasons-in-one-day variability. Mild winters (rarely below 5°C, occasional ground frost), hot summers (often 30°C+ with sudden 40°C+ heat events), low-medium rainfall (~650mm/year), cool changes bring 15-20°C drops. Wind exposure for Port Phillip Bay-side suburbs.
ESV electrical licence and CES
Energy Safe Victoria (ESV) electrical licence is mandatory in Victoria for any EV charger install. AS/NZS 3000 (Wiring Rules) and AS/NZS 4777 (grid-connect where applicable) apply. Certificate of Electrical Safety (CES) lodged with ESV on every install. Print ESV licence number, CES fee (A$38-A$88), and AS standards on every quote.
Single-family residential market
Premium suburbs (Toorak 3142, Brighton 3186, Hawthorn 3122, Kew 3101, South Yarra 3141, Canterbury 3126) and outer-suburb new builds drive Level 2 EV charger demand. Quote A$2,750-A$4,750 installed for 7kW single-phase wall charger (Wallbox Pulsar Plus, Tesla Wall Connector, JET Charge, Ocular IQ, EO Mini Pro 3) on existing switchboard capacity. Add switchboard upgrade where required.
Solar Victoria EV charger rebate bundled with solar
Solar Victoria EV charger rebate A$1,250 when bundled with a solar PV install. Quote rebate as a line on the bundled-system net cost; conversion rate doubles when rebate is visible. Pitch combined solar plus EV charger as a single Solar Victoria application; reduces administration.
Switchboard upgrade often required
Most pre-2000 Melbourne homes still run a ceramic-fuse or early MCB switchboard incapable of carrying an EV charger circuit (32A-40A) alongside induction cooktop, heat-pump hot water, ducted aircon. Quote switchboard upgrade (A$3,130-A$8,130 standard, A$6,880-A$18,750 for large premium homes) as a contingency line on every pre-2000 home.
OC apartment carpark installs
Apartment and townhouse carpark EV charger installs need OC approval (4-8 weeks) plus engineer sign-off on shared electrical capacity. Quote per-charger A$4,380-A$10,650 plus OC-shared infrastructure (sub-metering, common-meter swap A$6,880-A$31,250+) as separate lines. NSW Strata and Victorian OC schemes are similar. Bulk-buy for the whole block drives per-charger lower.
Three-phase upgrade for fast chargers
Fast 11kW or 22kW three-phase EV chargers (Wallbox Pulsar Max, Schneider EVlink Smart Wallbox, ABB Terra AC) need three-phase power supply. Quote three-phase upgrade (A$4,380-A$10,650 if existing single-phase) plus AusNet/Powercor/Jemena/United Energy authority coordination (4-10 weeks lead time) as separate lines. Premium-suburb clients with Porsche Taycan, Audi e-tron, Mercedes EQS pay readily.
Sample quote
A real Melbourne EV charger installer quote you can copy
Single Level 2 32A EV charger install, garage, mid-range smart charger. Replace the line items and rates with your own; the structure stays.
Wallbox Pulsar Plus 32A Type 2 smart charger (3-year warranty, app control)
Dedicated 40A circuit breaker, isolator, RCD protection
Cable run (12m, 6mm conductor) from DB board to garage, surface clip
Load assessment + spare capacity verification on main supply
Electrical labour (4 hours: mount, wire, commission, app setup, test)
Certificate of Compliance (electrical)
Federal/state rebate (deducted at point of sale)
FAQ
Melbourne EV charger installer pricing questions, answered
Common questions about ev charger installer pricing in Melbourne, with answers framed for tradies pricing their own work.
Single-family Level 2 (7kW single-phase) Wall Connector: A$2,750-A$4,750 installed on existing switchboard capacity. Three-phase 11kW or 22kW: A$4,380-A$10,650 installed (plus three-phase upgrade if single-phase only). Apartment carpark: A$4,380-A$10,650 per charger plus OC shared-infrastructure. Add GST (10%). Print ESV electrical licence number on every quote.
Yes. Energy Safe Victoria (ESV) electrical licence is mandatory in Victoria for any EV charger install. AS/NZS 3000 (Wiring Rules) and AS/NZS 4777 (grid-connect where applicable). Certificate of Electrical Safety (CES) lodged with ESV on every install. Print ESV licence number, CES fee (A$38-A$88), and AS standards on every quote.
Yes, on every pre-2000 Melbourne home as contingency. Most pre-2000 homes have ceramic-fuse or early MCB boards that can't carry an EV charger circuit (32A-40A) alongside induction cooktop, heat-pump hot water, ducted aircon. Quote switchboard upgrade A$3,130-A$8,130 standard, A$6,880-A$18,750 for large premium homes as contingency line.
Solar Victoria EV charger rebate A$1,250 when bundled with a solar PV install. Quote rebate as a line on the bundled-system net cost; conversion rate doubles when rebate is visible. Pitch combined solar plus EV charger as a single Solar Victoria application; reduces administration. Eligible Victorian households earning under A$265k/year.
Quote per-charger A$4,380-A$10,650 plus OC-shared infrastructure (sub-metering, common-meter swap A$6,880-A$31,250+) as separate lines. OC approval (4-8 weeks) plus engineer sign-off on shared electrical capacity required. Bulk-buy for the whole block drives per-charger lower. Lock in master-services agreements with OC committees and property managers.
A standard Level 2 (32A, 7kW) wall-mount install runs $1,500 to $4,380 in the US, £900-2,500 in the UK, A$1,880-4,000 in Australia, R12,000-35,000 in South Africa, and C$1,880-3,800 in Canada. The unit accounts for 30-50% of the total; the rest is electrical work and certification.
Level 1 uses a standard 10-15A outlet, adds 8-15km of range per hour. Level 2 uses a 32-50A dedicated circuit, adds 40-80km of range per hour. Level 1 suits short-commute drivers; Level 2 is the residential standard. Level 3 (DC fast) is commercial only.
Yes. EV chargers are licensed electrical work. In most regions, an EV-certified electrician is required (OZEV in UK, EV-trained Master Electrician in US/Canada/Australia, wireman's licence holder with EV training in SA). The certification protects you and is required for rebates.
Yes, 2-3 quotes for any install over $1,880. Compare charger brand, cable spec, certification, and warranty. The cheapest quote often skips the load assessment, uses sub-grade cable, or omits the CoC, all of which are dangerous or illegal.
Depends. A 32A EV charger draws 7.4kW continuously. On a 60A main supply with electric oven, geyser, and aircon, you may need a utility upgrade or smart load management. Insist on a written load assessment before installation.
Keep going
More EV charger installer resources
The full international pricing guide, ready-to-send templates, and the main ev charger installers page.
Testimonials
Trusted by tradespeople in Melbourne
Real ev charger installers and other tradies in Melbourne use QuoteGenio to quote and invoice from their phone.
“The biggest win for me is speed. I can quote while I am still with the client and not worry about doing it later.”
Jason Naicker
Electrician · New Delhi
“Solar is a long sales cycle. The quote activity tracking lets me see who has re-opened a quote so I know when to follow up. Very useful.”
Hannah Clarke
Solar Installer · Manchester
“I used to delay sending quotes because it took too long. Now I do it straight after the job and get faster responses.”
Warren Jacobs
Plumber · Geneva
Read more
Guides on pricing and quoting
Long-form posts from the QuoteGenio blog that go deeper on quote writing, pricing strategy, and getting paid.
What a Free Quoting Tool for Tradespeople Should Do
Not every free quoting tool for tradespeople earns its keep. A plain checklist of what to look for, what to avoid, and what tradies actually use.
Convert a Quote to an Invoice in One Tap, No Retyping
The one-tap convert flow eliminates the retyping, the duplicate invoice numbers, and the mismatched line items that cost tradies hours each week.
Voice to Quote: Dictate a Job, Get Priced Line Items
Hold the mic, describe the job in your own words, release. The AI drafts a priced quote. What Voice to Quote is, when to use it, and when not to.

Free forever plan
Start quoting faster. Win more jobs.
Create professional quotes in minutes, send instantly, and stay on top of your work without the admin slowing you down.
Free to start. No credit card required.
