QuoteGenio logoQuoteGenio
Back to blog
Quoting Tips8 min read

How to Price Materials Correctly on Every Quote

How to Price Materials Correctly on Every Quote

Materials are where most quotes leak profit. Here is how to mark them up properly, handle price changes, and stop losing money to supplier increases.

Materials are the quietest profit leak in most trade businesses. The labour rate gets all the attention, but the markup on a $ 4,000 materials line is what actually pays for the bookkeeper and the new ute tyres.

Most tradies either undercharge by a long way or guess. Here is how to price materials properly so every quote protects your margin instead of crossing your fingers.

Why a markup is not optional

When you supply materials, you are doing more than handing over a box of fittings. You are sourcing them, paying for them upfront, transporting them, storing them, and carrying the risk if anything is wrong.

All of that costs money. The markup covers it. Charging materials at supplier cost means you are running a free delivery service for the merchant and absorbing every supplier price hike yourself.

Standard markup ranges

Common markups across the trades:

  • Small consumables (silicone, screws, fittings): 30% to 50%
  • Mid-range items (taps, fittings, basic switchgear): 20% to 30%
  • Large items (geysers, distribution boards, ovens): 15% to 20%
  • Special order or imported items: 25% to 40% to cover the risk

These are starting points. If you are doing high-volume work for a developer, your markup might be lower because you are turning stock fast. If you are doing one-off bathroom renovations, your markup should be at the top end because you carry more risk.

QuoteGenio supports free quotes and invoices for builders, with a materials list that auto-applies the markup as you build the quote. No mental math, no surprises.

How to handle supplier price changes

Supplier prices move. Copper, timber, fittings, all of it. Your quote needs language that protects you against changes between quote and execution.

Two ways to do it:

Quote validity period

"This quote is valid for 30 days. Materials priced at quote date. Significant supplier price changes after acceptance may be passed through with notice."

Short and clear. Most clients accept it without question because it is industry standard.

Cost-plus on volatile items

For long jobs or big materials orders, quote the labour fixed and the materials cost-plus. "Materials charged at supplier invoice plus 20%, copies of supplier invoices available on request." The client gets transparency, you get protection.

If you are working out quotes and invoices for plumbers on a copper-heavy job, cost-plus is often the only way to quote without losing your shirt to commodity price swings.

Build a materials database

Pricing every job from scratch is slow and inconsistent. Build a database of the items you use most often, with the supplier price and your sell price already loaded. Update it monthly.

A simple database has six columns:

  • Item description
  • Supplier
  • Supplier code
  • Cost price (last updated)
  • Markup percentage
  • Sell price

Once it exists, quoting is dragging items into a list and adjusting quantities. A two-hour quote becomes a 20 minute quote.

A built-in price book does this for you automatically. You can also work the totals up on a free quote calculator, while anyone still on a spreadsheet is paying for it in time.

Don't forget waste and handling

Materials lists rarely match what you actually use. You break a tile, you cut a length of cable wrong, you order a spare washer because the merchant is 30 minutes away. Build waste into the quantity.

Standard waste percentages by trade:

  • Tiles: 10% waste
  • Timber: 8% to 10% waste
  • Cable: 5% waste
  • Paint: 5% to 10% depending on surface
  • Plasterboard: 5% to 8%

Add the waste to the quantity, then apply the markup to the total. The client pays for what you actually buy, not the theoretical minimum.

Worked example

Bathroom refurb. Materials breakdown:

  • Tiles: $ 1,200 supplier cost + 10% waste = $ 1,320, marked up 25% = $ 1,650
  • Adhesive and grout: $ 180 + 25% = $ 225
  • Tap set: $ 380 + 20% = $ 456
  • Vanity: $ 720 + 20% = $ 864
  • Sundries (silicone, screws, washers): $ 90 + 40% = $ 126

Materials line on the quote: $ 3,321. Cost to you: about $ 2,570. Margin on materials alone: about $ 750. That is real money that pays your overhead before you even count the labour.

Common materials pricing mistakes

  • Charging materials at cost because you feel weird about a markup
  • Using last year's supplier price in this year's quote
  • Forgetting waste, then having to absorb the extra trip to the merchant
  • Lumping materials into a single line with no detail, then having to argue line-by-line later
  • Quoting volatile items fixed instead of cost-plus

If you are not sure your prices are protecting you, start from a set of free quote templates and set up a price book that updates with supplier changes.

The bottom line

Materials should make money, not break even. Apply a real markup, build a price book, add waste, and use cost-plus wording on volatile items. Do that on every quote and the back end of your business stops bleeding margin you never knew you were losing.

If this is your day-to-day, QuoteGenio puts it all in one place. Branded PDFs, WhatsApp send, deposits, and online acceptance are built in.

Build a materials price book in QuoteGenio and quote in minutes.

Quote this work in QuoteGenio

Built for these trades

Each trade has its own landing page with sample quotes, pricing benchmarks, and a free quote builder.